HRMS Aditya Today I worked on shift section where update all the action methods based on the requirement and also test attendance module with dummy data Done 11/02/2026 09:25 PM
HRMS Aniket Today worked the attendance module on puchin APIs and added employee name in deptoff get api and fixed it Attendance in progress deptoff APIs completed 11/02/2026 09:10 PM
Billing And Invoice(Backend) Aniket Today I solved the bugs of invoice APIs and fixed all the APIs Done 11/02/2026 09:09 PM
LMS Internal Panel Shivam Kumar Developed service methods and APIs to fetch meetings where the user is organizer or attendee with date and month filters. Improved attendee validation, meeting time checks, refined endpoint naming as per REST standards, and optimized attendee search logic to avoid partial ID match issues Enhancements completed and tested successfully. 11/02/2026 07:49 PM
Billing and invoice (frontend) Clinton Laishram Working on exporting data functionality. Added export functionality in pdf or excel format in all the pages. Added disable account functionality. Fully tested the new updates. done 11/02/2026 07:47 PM
LMS Internal Panel Priyanshi Jain Today I've done testing of routing, testing and routing price and also fixed the bugs. Completed 11/02/2026 07:35 PM
HRMS Priyanshi Jain In the leave module, I added the functionality to assign department holidays to multiple and individual employees. In progress 11/02/2026 07:33 PM
HRMS Abhimanyu singh Add reimbursement module and create component for expense claim Module added, working on component 11/02/2026 07:30 PM
HRMS Rashi Garg Today, I've integrated the referral summary API, created an application form for referred candidates, and integrated the resume extraction API into it. Done 11/02/2026 07:29 PM
HRMS Rashi Garg Today, I've integrated the referral summary API, created an application form for referred candidates, and integrated the resume extraction API into it. Done 11/02/2026 07:24 PM
HRMS Kashish varshney Worked on exit module apis Done 11/02/2026 07:23 PM
Social Media Creatives Seema Kumari research and create social media post for the great work place, Cpaas business, and redesign one week meffy post na 11/02/2026 07:05 PM
Content Research Souvik Mazumder Content research for creatives and other sourcing for creatives Cretaed content, prepared pdfs for approval and also sources images for posts 11/02/2026 07:03 PM
Onboarding Panel Shashank Vyas tested onboarding panel and fix some bugs in upload documents section add document validation and size limit to upload document. done 11/02/2026 07:01 PM
HRMS Saloni Jain Today i worked on the Exit module changes added some remark functionality when manager change the notice period nd add employee submit kt to manager and another employee added this done 11/02/2026 06:34 PM
LMS Internal Panel Rahul Yadav WORKED ON lms internal pannel in background meeting note and made multiple APIs for it and validate the fields in model done 11/02/2026 06:34 PM
HRMS Pawanpreet Kaur Today I worked on the referral reward background service, where I implemented and refined the logic to automatically identify eligible referred employees after their probation and confirmation, fetch the correct referral reward based on the referrer’s level, and add the reward to the next payroll cycle through payroll salary components. I also set up duplicate reward prevention, ensured correct salary computation mapping for the upcoming payroll month, and implemented notifications for both the referrer and the HR department. Overall, I focused on making the referral reward process automated, payroll-aligned, and notification-enabled to minimize manual HR intervention. Done 11/02/2026 06:28 PM
LMS Internal Panel Anshu Chauhan Integrated meeting tool in the Internal panel. Integrated API and updated UI. inprogress 11/02/2026 06:26 PM
HRMS Kashish varshney Worked on exit module Done 10/02/2026 07:33 PM
Other Projects Souvik Mazumder Looked over for GMB assistance for GNJ Indonesia Assisted with the process to update the map locations step by step 10/02/2026 07:03 PM
Social Media Creatives Seema Kumari create and research regarding the cpass business and change 1 week left for voting none 10/02/2026 06:59 PM
Content Calendar Souvik Mazumder Reallocation of content as per instructions and content preparation COntent allocated, now content researched and alternate options prepared for reserve. content provided for creative preparations. 10/02/2026 06:58 PM
LMS Internal Panel Shivam Kumar Enhanced the LMS Internal Panel by finalizing Add/Update Meeting APIs with proper validations, attendee handling, and partial update support. Implemented full Meeting Notes service with add, get, update, and delete functionality along with authorization checks for organizer and attendees. Also ensured data type consistency, improved controller responses, and added support for fetching meetings by month for reporting. All functionalities implemented and tested successfully. 10/02/2026 06:43 PM
HRMS Aditya Today I worked on completing the given changes updated from HR team Done 09/02/2026 11:21 PM
HRMS Abhimanyu singh Add given changes to ui Done 09/02/2026 07:30 PM
Social Media Report Souvik Mazumder Linkedin report for Dec and Jan Prepared content and shared for review and final presentation 09/02/2026 06:44 PM
Content Research Souvik Mazumder Linkedin content research and feb calendar content aligning Content researched(post copy) shared and posted final post on linkedin , feb calendar updated as per contents available 09/02/2026 06:43 PM
Meeting tool Shivam Kumar Worked on the Meeting Notes API and resolved a 400 validation issue caused by invalid JSON for multiline notes with special characters (no backend change required). Also updated existing functionality as per new requirements and added PUT and DELETE APIs for Meeting Notes by ID, verifying all changes through testing. APIs updated and tested successfully. 06/02/2026 08:20 PM
HRMS Abhimanyu singh Do the changes to the ui of dashboard Done 06/02/2026 07:31 PM
HRMS Shivam Kumar Implemented the offer letter upload flow in HRMS by saving files to the server and updating their paths in the database. Added HR letter logging after successful upload and email sending, and worked on sending offer letters to candidates with proper validation and attachment support. Flow implemented and tested successfully. 05/02/2026 08:06 PM
Content Research Souvik Mazumder Content research and posting on linkedin Content created and shared all options for this week and Next Monday, also posted the post for today 05/02/2026 06:39 PM
HRMS Abhimanyu singh Make changes to admin dashboard Done 04/02/2026 07:31 PM
Billing and invoice (frontend) Clinton Laishram I have worked on dashboard of billing panel. Added new section and made improvement on previous sections. on Progress 03/02/2026 07:34 PM
Content Research Souvik Mazumder Linkedin content finalisation and posting and research on GPTW posting PR publication Finalised and published the content as per calendar, researched for next week topics and started research on the GPTW PR release 03/02/2026 06:54 PM
HRMS Abhimanyu singh Work on Admin dashboard Doing 02/02/2026 07:31 PM
HRMS Kashish varshney Give demo to HR of TA module and some solve bugs in onboarding Done 02/02/2026 07:22 PM
Other Projects Souvik Mazumder Birthday Templates resources collection and allotment for preparation Sourced pictures for all team members for sent for preparation, 1 remaining due to lack of photos 02/02/2026 06:41 PM
Content Research Souvik Mazumder 1st week of Feb content for Linkedin, approval and posting Researched content and sent items for approval, posted as per content calendar for Feb 02/02/2026 06:39 PM
HRMS Yash Veer Jain Attend and Demonstrate the ta module in meeting to the hr team Done. Also make the minutes of meeting. 02/02/2026 06:34 PM
HRMS Kashish varshney Worked on onboarding checklist and making ppt Done 30/01/2026 09:36 PM
HRMS Abhimanyu singh Work on user dashboard Done 30/01/2026 09:26 PM
HRMS Rahul Yadav Worked on employee document upload to add multiple items and the types of documents Done 30/01/2026 07:48 PM
Digital marketing panel Shivam Kumar Fixed multiple bugs in the Digital Marketing Panel, improved API stability, and validated affected modules to ensure smooth functionality. Performed testing after fixes to confirm expected behavior across key flows. Bug fixes completed and changes verified successfully. 30/01/2026 07:45 PM
Other Projects Souvik Mazumder CSR Project- PPt creation Prepared an initial ppt to be reviewed by ANURAG SIR, completed by start of 2nd half 30/01/2026 06:56 PM
Content Calendar Souvik Mazumder Finalising the content calendar with needed changes Made the changed, need to find alternate posts as reserve for feb calendar, posted todays post and created next week pdfs and sent for approval 30/01/2026 06:56 PM
LMS Internal Panel Shivam Kumar Developed Live Number Logs APIs to fetch all logs, logs by LogId, and logs by LiveNumberId with proper role-based authorization (Admin, NOC). Implemented ordered log retrieval and safe JSON deserialization for old and new data, and verified all endpoints through testing. APIs implemented and tested successfully. 29/01/2026 07:55 PM
HRMS Abhimanyu singh Integrate user APIs with dashboard Done 29/01/2026 07:49 PM
Billing and invoice (frontend) Clinton Laishram Working on dashboard for billing panel. Added chart and data card that show in insightful data. on Progress 29/01/2026 07:48 PM
HRMS Rashi Garg Today I worked on the LMS diversity PPT Done 29/01/2026 07:18 PM
Content Calendar Souvik Mazumder Janurary Linkedin onboarding post Completed and post published in linkedin 29/01/2026 07:05 PM
Other Projects Souvik Mazumder HR presentation Completed CSR report and shared final version 29/01/2026 07:04 PM
Social Media Creatives Seema Kumari Create social media post and visit out site for marketing collateral na 29/01/2026 06:57 PM
HRMS Rahul Yadav worked on bulk upload of employee details through excel sheet by HR done 29/01/2026 06:53 PM
ID Card Design Mohit Kumar done done 29/01/2026 06:36 PM
Social Media Creatives Mohit Kumar done done 29/01/2026 06:36 PM
Event Marketing Collateral Designs Mohit Kumar done done 29/01/2026 06:36 PM
Other Projects Mohit Kumar done done 29/01/2026 06:36 PM
Content Calendar Sumeet Kumar Singh Working on the February month calender. na 29/01/2026 06:36 PM
HRMS Yash Veer Jain Complete the common dashboard for the project Complete 28/01/2026 08:01 PM
HRMS Rahul Yadav Working on employee import data through Excel file to fill new data Done 28/01/2026 08:01 PM
HRMS Abhimanyu singh Work on user dashboard Doing 28/01/2026 07:31 PM
HRMS Kashish varshney Solve Apis of employee module Done 28/01/2026 07:13 PM
Digital marketing panel Shivam Kumar Fixed and validated the Email Service to ensure proper email delivery, and optimized API response timing which was previously slow. Improvements implemented and verified successfully. 28/01/2026 07:11 PM
Other Projects Sumeet Kumar Singh Giin N Jain google ads camapign has been setup updated one. na 28/01/2026 07:03 PM
Other Projects Sumeet Kumar Singh Working on February month calender. NA 28/01/2026 07:02 PM
Content Research Sumeet Kumar Singh Prepare the image and post copy for the emanuele and eishan. na 28/01/2026 07:02 PM
Other Projects Souvik Mazumder CSR Presentation COmpleted presentation with HR team 28/01/2026 07:02 PM
Content Calendar Souvik Mazumder Content and image copy finalisation for linkedin content Provided all the details and post published 28/01/2026 07:02 PM
Meeting tool Shivam Kumar Added Meeting Notes APIs using Meeting ID, allowing both host and attendees to create and fetch notes for a specific meeting. Implemented access logic to ensure only authorized users can manage and view meeting notes, and verified the functionality through testing. Implemented and tested successfully. 28/01/2026 07:00 PM
HRMS Shashank Vyas Today I had fixed archive salary UI , fix the fields in the payslip, and doing testing on payroll. done 28/01/2026 06:56 PM
Social Media Creatives Seema Kumari create social media post and ppt Done 28/01/2026 06:54 PM
LMS Internal Panel Shivam Kumar Added Notification and Email services to the ticket workflow and verified their integration. Implemented Live Number Logs by creating the required model and APIs to capture and store update history, including old and new values with user details. Tested the logging flow to ensure updates are tracked correctly. Completed till here 27/01/2026 08:01 PM
ServiceResumeReader Abhimanyu singh Make changes as suggested Done 27/01/2026 07:33 PM
HRMS Kashish varshney Testing on TA module and solve bugs on some apis Done 27/01/2026 07:20 PM
HRMS Yash Veer Jain fix the dashboard and also fix the other bugs Done 27/01/2026 06:58 PM
Meeting tool Yash Veer Jain Check and fix the forget password api issue and also integrate the update password api's Complete 27/01/2026 06:57 PM
Event Marketing Collateral Designs Seema Kumari Creative video and social media Done 27/01/2026 06:53 PM
LMS Internal Panel Shivam Kumar Designed and implemented the NOC → AM ticket flow using a single Ticket table. Added NOC ticket creation, AM pickup, and resolution workflow with role-based logic and secured APIs. Completed till here. 24/01/2026 07:52 PM
ServiceResumeReader Abhimanyu singh Improve the ui as per requirement Done 24/01/2026 07:33 PM
ServiceResumeReader Aditya Today, I worked on the resume sender service. I created dashboard APIs for resume analytics, including monthly and yearly reports, date-wise data, and year-wise search filters. Done 24/01/2026 07:04 PM
HRMS Kashish varshney Worked on HRMS add logger in apis and add change apis in user module or add some apis in itsupport module DONE 24/01/2026 07:02 PM
HRMS Yash Veer Jain Make a dashboard profile card for the common dashboard Done 24/01/2026 06:42 PM
Meeting tool Yash Veer Jain Complete all the changes that is given by the anurag sir in all coomponents and also make it responsive Completed and project is also lived today 24/01/2026 06:41 PM
HRMS Rahul Yadav worked on clearance and Employee Controller Added Loggers and used Exception Handling in Every APIs And Tested The Apis Which is working or not . Done 24/01/2026 06:19 PM
Meeting tool Shivam Kumar Added required fields and updated APIs in the Meeting Schedule project as per functional requirements. Verified the updated request and response flow. Changes implemented successfully and tested. 23/01/2026 07:32 PM
HRMS Clinton Laishram Adding functionality to create credentials of employee that do not have login credentials. Also fixed bug on employee table (data no showing properly). Also doing research for ui for cpass panel. done 23/01/2026 07:23 PM
Other Projects Souvik Mazumder MEFFY Video Creation Video under progress- Template shared, content shared, assist with the text and formation, created the VR cards and portfolio for all required individuals and sent to Dev team for QRcode preparation 23/01/2026 07:02 PM
Other Projects Souvik Mazumder Image assistance to HR team for GPTW presentation Provided the images, sorted out the changes and filtered out the images, to be shared the next day 23/01/2026 07:02 PM
Other Projects Sumeet Kumar Singh Coordinate with Mohit for Meffy video NA 23/01/2026 06:56 PM
HRMS Rahul Yadav worked on whole LMS website Newsroom controller with models and its neccessary Dtos for APIs done 23/01/2026 06:46 PM
Meeting tool Yash Veer Jain Setup the frontend and start working on the project setup Complete the register page and login page including integration of api's 22/01/2026 08:02 PM
HRMS Yash Veer Jain Fix the ui changes of the onboarding module Complete 22/01/2026 08:02 PM
Meeting tool Shivam Kumar Created User Service and Controller with functionalities including User Creation, Login, Forgot Password, and Email OTP verification. Completed till here. 22/01/2026 07:53 PM
HRMS Abhimanyu singh Test leave module Done 22/01/2026 07:27 PM
HRMS Rashi Garg Today I have optimized the code in the TA module, enhancing its performance and efficiency. The changes include refactoring redundant code block. Inprogress 22/01/2026 07:22 PM
HRMS Kashish varshney Worked on Onboarding Module and meeting tool Done 22/01/2026 07:13 PM
HRMS Priyanshi Jain Today I fixed the permission bug in the leave module, added API fields to the UI, and made other necessary changes. Completed 22/01/2026 07:11 PM
HRMS Kashish varshney Worked on Onboarding Module and meeting tool Done 22/01/2026 07:10 PM
Other Projects Souvik Mazumder MEFFY Video Creation Video under progress- Template shared, content shared, assist with the text and formation, created the VR cards and portfolio for all required individuals and sent to Dev team for QRcode preparation 22/01/2026 07:01 PM
HRMS Clinton Laishram Worked on responsiveness of employee module page, account page and permission table page. Also do research for ui and design for cpass project using authkey.io website. Done 21/01/2026 08:04 PM
HRMS Abhimanyu singh Test leave module Doing 21/01/2026 07:31 PM
HRMS Shivam Kumar Fixed bugs in the Exit Clearance module and verified the updated workflow through testing. Bug fixes completed and changes validated. 21/01/2026 07:22 PM
HRMS Kashish varshney Solve bugs on exit module and onboarding Done 21/01/2026 07:06 PM
Other Projects Souvik Mazumder MEFFY Video Creation Video under progress- Template shared, content shared, assist with the text and formation, created the VR cards and portfolio for all required individuals and sent to Dev team for QRcode preparation 21/01/2026 07:02 PM
HRMS Yash Veer Jain Work on the UI changes for the exit module and complete the final changes of the relieving letter. Complete 21/01/2026 07:00 PM
HRMS Shashank Vyas Today i had completed the testing of onboarding module and update the appointment letter template. done 21/01/2026 07:00 PM
HRMS Ayush Tested and deployed frontend and also fix bug of payroll, also worked on LOI document. Done 21/01/2026 06:59 PM
HRMS Rahul Yadav worked on employee APIs where i added extra field to store data and solved some bugs on it done 21/01/2026 06:31 PM
HRMS Kashish varshney Solved bugs on exit and onboarding module Done 20/01/2026 10:12 PM
HRMS Shivam Kumar Tested the DWR module in HRMS and fixed a bug in the Exit module. Verified the updated flow to ensure everything is working as expected. Testing completed; bug fix work is still in progress. 20/01/2026 08:01 PM
HRMS Abhimanyu singh Ta testing Doing 20/01/2026 07:40 PM
HRMS Rashi Garg Today, I fixed the bugs in the TA module, standardized the structure of all tables and dialogs, and met with HR for approval of the LOI (Letter of Intent) Done 20/01/2026 07:27 PM
HRMS Priyanshi Jain Today I added salary details to the employee details page, made it editable, and fixed API fields accordingly, updating the UI. Done 20/01/2026 07:27 PM
HRMS Yash Veer Jain Ui fixes and bugs fixes , meeting with hr team Complete the it support ui, also attend the meeting with hr for the relieving letter ui and discussion, also give kt of exit module to the team member. 20/01/2026 07:24 PM
HRMS Shashank Vyas today i had completed the testing of the permissions and update the appointment letter template as per the changes told by HR. . done 20/01/2026 07:00 PM
HRMS Saloni Jain Today i reseolved the bugs of onboarding nd dwr moduel frontend part done 20/01/2026 06:56 PM
Content Research Souvik Mazumder Feb content preparation- content for linkedin- image and post copy Started with the contents and listing in the shared LIVE folder, ready for creative generation, under progress 20/01/2026 06:56 PM
Other Projects Souvik Mazumder MEF Video preparation assist, Virtual card and portfolio preparation Video under progress- Template shared, content shared, assist with the text and formation, created the VR cards and portfolio for all required individuals and sent to Dev team for QRcode preparation 20/01/2026 06:54 PM
LMS Website Rahul Yadav worked on Vcard and generated the details via one click which is saved in root file done 20/01/2026 06:46 PM
HRMS Clinton Laishram i have worked on responsiveness of leave module pages. also fixed the bug of attendance module. done 19/01/2026 07:41 PM
HRMS Abhimanyu singh Test ta section In progress 19/01/2026 07:31 PM
HRMS Shivam Kumar Tested the DWR module in HRMS thoroughly and verified all functional flows. Identified front-end related issues during testing and raised them for further action. Testing completed; issues documented in Excel and shared with the Front-end team 19/01/2026 06:59 PM
Content Research Souvik Mazumder ESG video content research and linkedin post content for ICE Barcelona and Capacity Middle East Shared all Data for ESG, CSR and linkedin content for ICE and Anurag sir's panel repost 19/01/2026 06:54 PM
HRMS Priyanshi Jain Today I fixed issues in edit mode, added document preview and download functionality on the employee details page and improved it's responsiveness. Completed 19/01/2026 06:45 PM
HRMS Rashi Garg Today I improved responsiveness in the TA module, making changes across components to follow the structure. Done 19/01/2026 06:45 PM
LMS Website Rahul Yadav worked on LMS website Virtual Card Module modified API because its Occuring some error on it currently Working on it On Process 19/01/2026 06:41 PM
Content Calendar Sumeet Kumar Singh Pdf shared to pragya for this week and upcoming week content of Jan Month Calender. NA 19/01/2026 06:41 PM
Content Calendar Sumeet Kumar Singh Feb Calender Completed. Waiting for approval for Feb Calender. NA 19/01/2026 06:40 PM
HRMS Clinton Laishram Worked on themes of hrms panel. Fixed the ui issue of sidebar. fixed ui issue and responsiveness of daily attendance and teams attendance page. done 16/01/2026 08:22 PM
HRMS Abhimanyu singh Fix notice service Done 16/01/2026 07:40 PM
HRMS Ayush Tested TA and Payroll. Also, Fixed bugs of payroll. Done 16/01/2026 07:05 PM
HRMS Rashi Garg Today I worked on the TA module's responsiveness and tested it, also fixing the bugs that came up. Inprogress 16/01/2026 07:00 PM
HRMS Shivam Kumar Updated Candidate APIs in HRMS and fixed issues identified during front-end testing. Improved request/response handling to ensure smooth integration and verified all affected endpoints. All reported issues resolved and changes tested. 16/01/2026 06:58 PM
HRMS Kashish varshney Worked on user model and update services or testing Onboarding Module Done 16/01/2026 06:53 PM
HRMS Priyanshi Jain Today I worked on improving responsiveness in the leave module and added sections to the employee details page. In progress 16/01/2026 06:53 PM
LMS Website Rahul Yadav worked on NewsRoom Controller in Lms Website made the related model done 16/01/2026 06:40 PM
Other Projects Sumeet Kumar Singh Preparing the rough draft doc of feb month calender. na 16/01/2026 06:20 PM
Content Calendar Sumeet Kumar Singh Working on jan month content, Feb month and draft the image and post copy and send it to pragya. na 16/01/2026 06:19 PM
Content Research Souvik Mazumder Content Research for Feb Calendar, brochures and new event Prepared the content for the above tasks and shared in the group 16/01/2026 04:29 PM
HRMS Abhimanyu singh Work on ui Done 15/01/2026 07:30 PM
HRMS Ayush Modify the work flow of LOI generation as it is previously generated from Backend, now I have integrated from frontend, also tested functionality of payroll generation and payroll adjustments. Done for the day, LOI integration is pending waiting for hr approval. 15/01/2026 07:10 PM
Legal Draft Shivam Kumar Worked on Legal Draft template management by refining the Update Template API with optional DOCX replacement. Fixed Swagger issues related to duplicate template IDs, finalized soft delete and restore flow for templates, and added multiple template field sets for different regions. Tested and validated legal draft generation with verified payloads. Completed and tested till here. 15/01/2026 06:59 PM
HRMS Yash Veer Jain Start Working on the SuperAdmin Page of hrms project Initiate, Also Make QR Code of Career Post for the marketing Team 15/01/2026 06:54 PM
HRMS Shashank Vyas Today i had done testing of permissions in the payroll and TA module. done 15/01/2026 06:53 PM
HRMS Yash Veer Jain Work on the setting page and relieving letter Page Make signature page and integrate the api's and print the mandatory stamp to the letter ahead by hr setting page that will easily change through the setting page dynamically 15/01/2026 06:52 PM
HRMS Priyanshi Jain Today I created a manage users page for activating/deactivating users and are working on a create users page for generating login credentials. In progress 15/01/2026 06:50 PM
LMS Website Rahul Yadav worked on APIs to fetch the open jobtitle details through department done 15/01/2026 06:49 PM
HRMS Kashish varshney Testing Exit Module in HRMS Done 15/01/2026 06:46 PM
Event Marketing Collateral Designs Seema Kumari Searching design related to ppt and create ppt design and download video templet na 15/01/2026 06:46 PM
Content Research Souvik Mazumder PR and Newsletter topic listing and content research Created options for PR and Newsletters, PR sent for review and newsletter to be worked more upon 15/01/2026 06:45 PM
Other Projects Mohit Kumar panding na 15/01/2026 06:44 PM
Event Marketing Collateral Designs Mohit Kumar done na 15/01/2026 06:44 PM
Social Media Creatives Mohit Kumar done na 15/01/2026 06:44 PM
Content Calendar Souvik Mazumder Allocate topics to the Feb calendar and fill up details, ready to work upon Filled in details with some changes and made it ready to work on the content 15/01/2026 06:44 PM
HRMS Rashi Garg Today, I've focused on resolving the issues with the TA module, addressing the bugs and problems that were hindering its functionality, and making sure it's stable and working as expected. Completed 15/01/2026 06:43 PM
Content Research Sumeet Kumar Singh Working on jan month content and draft the image and post copy and send it to pragya. na 15/01/2026 06:38 PM
Other Projects Sumeet Kumar Singh Working on the LMS website content. NA 15/01/2026 06:34 PM
Content Calendar Sumeet Kumar Singh Working on Jan & Feb Month Calender NA 15/01/2026 06:33 PM
HRMS Priyanshi Jain Today I completed the onboarding form also tested it, and created a page for updating password Done 14/01/2026 08:38 PM
HRMS Clinton Laishram Worked on creating user to access hrms panel. after employee is created added the user creation to access panel. in that added the functionality to create permission of that user. on Progress 14/01/2026 08:32 PM
Legal Draft Shivam Kumar Deployed the Legal Draft project to live after completing required updates and validations. Verified functionality post-deployment to ensure everything is working as expected. Deployment completed successfully and system validated. 14/01/2026 08:07 PM
HRMS Abhimanyu singh Integrate notice APIs Done 14/01/2026 07:58 PM
HRMS Rashi Garg Today I completed the loi integration from front-end and sent to hr for approval Completed 14/01/2026 07:05 PM
HRMS Kashish varshney Testing Onboarding Module Done 14/01/2026 07:02 PM
HRMS Clinton Laishram I have worked on testing the leave module. Testing the leave policy and leave type adding and leave request and approval mechanism. Also work on employee module, fixing the bug in updating employee details. done 13/01/2026 09:27 PM
HRMS Priyanshi Jain Today I integrated APIs in the onboarding form, added logic to enable/disable fields, and created forgot and reset password pages with API integration. Done 13/01/2026 07:03 PM
HRMS Kashish varshney Testing It support module and work on user APIs to update Done 13/01/2026 06:59 PM
HRMS Rashi Garg Generation of Letter of Intent from front-end using canvas Inprogress 13/01/2026 06:59 PM
LMS Website Rahul Yadav worked on whole virtual card APIs and whole Portfolieos APIs done 13/01/2026 06:59 PM
HRMS Shivam Kumar Updated Relieving Letter APIs in HRMS and enhanced the implementation based on front-end requirements. Adjusted request/response handling to ensure smooth integration and verified the updated flow. Changes implemented successfully and tested 13/01/2026 06:57 PM
HRMS Shashank Vyas today i completed the appointment letter in onboarding module ,generate the pdf of appointment letter using canvas . done 13/01/2026 06:55 PM
ID Card Design Mohit Kumar done done 13/01/2026 06:51 PM
Social Media Creatives Mohit Kumar done done 13/01/2026 06:50 PM
Content Research Souvik Mazumder Website Content and Linkedin Calendar Completed all the necessary content changes and new additions 13/01/2026 06:43 PM
Content Calendar Sumeet Kumar Singh Working on jan month content and draft the image and post copy and send it to pragya. na 13/01/2026 06:41 PM
Content Research Sumeet Kumar Singh Working on the LMS website porforlio content (Whatsapp, Viber and Email) and send the content to pragya final review. na 13/01/2026 06:40 PM
Content Calendar Mohit Kumar done na 12/01/2026 06:53 PM
Social Media Creatives Mohit Kumar done done 12/01/2026 06:53 PM
Content Calendar Souvik Mazumder Content refresher for altered content for linkedin Provided creative sets and content for linkedin and meta, all completed and scheduled 12/01/2026 06:45 PM
Content Research Souvik Mazumder Website Content- Solutions(Performance Marketing and AI driven solutions Worked on the verticals, performance marketing, AI solutions pending, to be completed tomorrow. 12/01/2026 06:43 PM
ID Card Design Mohit Kumar done done 12/01/2026 06:39 PM
Content Research Sumeet Kumar Singh Working on the LMS website porforlio content (SMS, RCS and Whatsapp) and send the content to pragya final review. na 12/01/2026 06:36 PM
Content Calendar Sumeet Kumar Singh Working on jan month content and draft the image and post copy and send it to pragya. na 12/01/2026 06:35 PM
Social Media Creatives Seema Kumari Meta calendar creative and carousel Searching ideas related to carousel and create meta calendar (Martyr's Day, Republic Day, Vasant Panchami, Army day) 12/01/2026 06:29 PM
Social Media Creatives Seema Kumari Meta calendar creative and carousel Searching ideas related to carousel and create meta calendar (Martyr's Day, Republic Day, Vasant Panchami, Army day) 12/01/2026 06:29 PM
Content Research Sumeet Kumar Singh Rephrase the content for the LMS website and send it to pragya for approval na 10/01/2026 06:36 PM
Content Calendar Sumeet Kumar Singh Working on the January Month Calender for next week and upcoming next week. Draft a pdf and send it to pragya for approval. na 10/01/2026 06:33 PM
Content Calendar Souvik Mazumder Feb Calendar Overview and Jan Calendar review and content finalisation Feb calendar prepared and jan calendar altered after review and replaced it with previous post and some new ideas 10/01/2026 06:32 PM
Social Media Creatives Seema Kumari Meta calendar creative and Ai first creative Created Ai First Creative and Some meta calendar creative - 4 left. completed creative shared in group for review 10/01/2026 06:24 PM
Content Research Souvik Mazumder Old content to be replaced with new content Researched for alternatives and provided options in the group 09/01/2026 06:42 PM
Content Calendar Souvik Mazumder Content research for replaced content for January Calendar Revised content have been shared, creatives created and shared, posted on linkedin 09/01/2026 06:39 PM
Content Calendar Sumeet Kumar Singh Working on the next week and upcoming week's content and draft a pdf of creatives and post copy, send it to pragya na 09/01/2026 06:38 PM
Content Research Souvik Mazumder Carousel content research for Case studies Prepare a sample for the case study and information shared in the group 08/01/2026 06:56 PM
Content Calendar Souvik Mazumder Content research for replaced content for January Calendar Content researched and shared in the content reserve tabs for replacing and future usage 08/01/2026 06:55 PM
ServiceResumeReader Rahul Yadav Worked on job title APIs and made isActive features to enable and disable job title to show the analyst Done 13/12/2025 11:16 PM
HRMS Saloni Jain Today i test the it support And discuss it with the It Admin , nd added some features Done 13/12/2025 10:00 PM
TeleNova_Connect_Website Ayush Worked on service page of the website In-progress 13/12/2025 08:59 PM
LMS Internal Panel Ayush tested TA module and suggested some changes Done 13/12/2025 08:58 PM
Legal Draft Abhimanyu singh Work on ui Doing 13/12/2025 08:49 PM
Legal Draft Shivam Kumar Added new templates and updated existing Word templates with all required placeholders. Ensured every placeholder is properly mapped with corresponding field keys and values in the database. Verified template readiness for seamless document generation. Templates updated successfully and validated end-to-end. 13/12/2025 08:34 PM
HRMS Priyanshi Jain Today I completed the offer letter section, fixed the issues and improve the ui Completed 13/12/2025 07:55 PM
HRMS Rashi Garg Today I test the TA module and fix the bugs.. Done 13/12/2025 07:53 PM
TeleNova_Connect_Website Clinton Laishram Worked on home page of the website along with responsiveness. on Progress 13/12/2025 07:47 PM
HRMS Kashish varshney Worked on Onboarding Module and discuss it support apis Done 13/12/2025 07:20 PM
HRMS Shashank Vyas Today i worked on the TA module fix ui in candidate journey and test TA module . done 13/12/2025 07:15 PM
Content Research Souvik Mazumder Content Research for December Calendar Topics and their approval Completed the research and shared content, approval pending 13/12/2025 06:36 PM
Content Research Souvik Mazumder Content Research for December Calendar Topics and their approval Completed the research and shared content, approval pending 13/12/2025 06:36 PM
HRMS Kashish varshney Worked on Onboarding Module and request apis Done 13/12/2025 01:26 AM
HRMS Mohit kaushal Today I worked on LOI module in which added some fields and updated the APIs and worked on job request module in which I made some in controller and updated it Done 12/12/2025 09:18 PM
HRMS Aditya Today I worked on two supporting database components: a Notification table and a Request Log table. The Notification table ensures that reporting managers receive alerts immediately when an attendance request is raised. The Request Log table maintains a detailed history of all actions taken on each request, enabling updates or modifications whenever required. These additions ensure transparency, trackability, and smooth handling of attendance correction workflows. Completed 12/12/2025 09:03 PM
HRMS Saloni Jain today i worked on the stock request page and add some feature in this and integrate it with put api. done 12/12/2025 09:02 PM
ServiceResumeReader Rahul Yadav I worked on job title and login form to validate the model with necessary field Done 12/12/2025 08:40 PM
HRMS Aniket Today I completed the development of the Attendance Request module. This module enables employees to submit a request when they forget to mark their attendance for any day. They can now raise both punch-in and punch-out requests, which will be routed directly to their reporting manager for approval. Along with the APIs for request creation and approval flows, I also ensured proper validation and structured processing to maintain accuracy in the attendance system. Done 12/12/2025 08:27 PM
Gate Pass Management Aniket Today I worked on department holidays and common holidays module in which I added validation that if holiday is already marked on that date it will not be marked again Done 12/12/2025 08:27 PM
HRMS Shashank Vyas Today i worked on candidate journey add details of candidate evaluation on the candidate journey timeline view . done 12/12/2025 08:27 PM
HRMS Ayush Discuss the working of offer letter frontend and backend both. Done 12/12/2025 08:14 PM
TeleNova_Connect_Website Ayush Search for Service page design and make why choose us component in the service page In-Progress 12/12/2025 08:13 PM
HRMS Pawanpreet Kaur Today, I carried out the Feedback service testing and also discussed the matter related to the appointment letter.I found a few issues during the review of feedback service . I fixed those issues and set everything properly. I also checked the remaining problems and resolved them accordingly. Done 12/12/2025 08:09 PM
TeleNova_Connect_Website Priyanshi Jain Today I made contact, contact us form , t&c and privacy policy pages. Done 12/12/2025 07:57 PM
HRMS Priyanshi Jain Today I worked on the offer letter, previewed the offer letter and also add edit form to edit it. In progress 12/12/2025 07:56 PM
ServiceResumeReader Abhimanyu singh Begin work on ui, finish layout and login Done 12/12/2025 07:45 PM
TeleNova_Connect_Website Anshu Chauhan Worked on the about section of this website Done 12/12/2025 07:38 PM
Legal Draft Shivam Kumar Worked on refining existing APIs by fixing minor bugs, improving internal logic, and verifying responses for accuracy. All API corrections completed successfully and code changes pushed after verification. 12/12/2025 07:33 PM
LMS Internal Panel Shreya Today I worked on the LMS internal panel. I made modifications in the Testing Controller. I updated the Create and Update methods—now during Create, it will first add the data to the database and return it, and after that, it will send the notification and email. I applied the same logic for Update first it updates, then the notifications are sent Completed 12/12/2025 07:30 PM
HRMS Rashi Garg Today, I've worked on the selected candidates' journey, creating a dedicated page for it and integrating the API. I've also discussed to create an evaluation API as it is required in the front-end Inprogress 12/12/2025 07:28 PM
Content Research Souvik Mazumder Recreate content for LinkedIn and provide post copies for 2nd half of December and Meta posts Completed the required content research and provided post copies for meta and LinkedIn and also for new ideas for nominations as instructed. 12/12/2025 07:23 PM
TeleNova_Connect_Website Clinton Laishram Worked on logo design. Also worked on ui design for the website. Search and design the ui for the website and created hero section. Done 12/12/2025 07:18 PM
HRMS Yash Veer Jain Discuss the asset and stock management page and their logic Pending with It Team 12/12/2025 07:02 PM
Gate Pass Management Yash Veer Jain work on the Holiday-based Report for easy calculation of the employee attendance and their working days by that hr's payroll works properly. Done. Tomorrow try to complete all the minor things and live the latest changes by e.o.d. 12/12/2025 06:54 PM
Legal Draft Shivam Kumar Tested all related APIs thoroughly and validated the flow with the legal team to ensure everything meets the required standards. Fixed minor issues found during review and confirmed all endpoints are working as expected. Testing and validation completed. 11/12/2025 11:30 PM
HRMS Aditya Today I worked on Attendance Module to handel puchin punchout ,Also work on Attendance Regularization and discussion with HR team on ResumeReader Service Done 11/12/2025 11:29 PM
HRMS Shreya Today im working on candidate journey controller added new methods for kanban view Completed 11/12/2025 09:37 PM
IT Admin and Support Prabhas Singh Vindhyaraj C drive Storage full : Resolved using AOMEI partition Done 11/12/2025 09:10 PM
IT Admin and Support Prabhas Singh Vindhyaraj Wifi not connect in Sumeet Laptop : Resolved by Network Reset Done 11/12/2025 09:08 PM
IT Admin and Support Prabhas Singh Vindhyaraj Domain Trust Issue problem resolved: Vivek, Aman Done 11/12/2025 09:06 PM
IT Admin and Support Prabhas Singh Vindhyaraj Monitor ATS & UPS Done 11/12/2025 09:05 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolve wifi auto disconnect issue: solve using static ip Done 11/12/2025 09:04 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolve Vivek, Durgesh, Gaurav, Aman VPN Issue Done 11/12/2025 09:03 PM
HRMS Saloni Jain Today i worked on the it support request module nd create 2 tabs asset issue , new asset request done 11/12/2025 08:55 PM
HRMS Aniket Today I worked on attendance module in which I added new model of attendance reinitiate and updated the database and made its CRUD API In progress 11/12/2025 08:51 PM
IT Admin and Support Deepak Diagnosed and resolved the BSOD (Blue Screen of Death) issue on the user’s laptop by checking hardware health, display drivers, and system stability, ensuring proper boot-up and normal display operation. Done 11/12/2025 08:31 PM
HRMS Mohit kaushal Today I worked on LOI module in which I made some changes added new fields and updated the database and controller Done 11/12/2025 08:30 PM
IT Admin and Support Deepak Diagnosed and resolved the domain login issue by verifying network connectivity, user credentials, and domain controller status, ensuring smooth login and uninterrupted user access. Done 11/12/2025 08:30 PM
IT Admin and Support Deepak Checked and monitored ATX and UPS systems to verify power stability, load status, and overall operational health. Done 11/12/2025 08:29 PM
IT Admin and Support Deepak Diagnosed and fixed the Wi-Fi auto-disconnect problem by checking adapter settings, power management, and network configurations, ensuring consistent and uninterrupted wireless connectivity. Done 11/12/2025 08:28 PM
IT Admin and Support Deepak Identified and resolved internet connectivity issues affecting multiple users by checking network settings, router status, and device configurations, ensuring stable and uninterrupted access Done 11/12/2025 08:26 PM
IT Admin and Support Deepak Installed and configured the VPN application for multiple users, ensuring proper setup, connectivity, and login access for each user. Done 11/12/2025 08:24 PM
HRMS Ayush Discuss the offer letter section and IT-admin section with team. Done 11/12/2025 08:05 PM
TeleNova_Connect_Website Ayush Setup the website template and research for it In-Progress 11/12/2025 08:03 PM
Gate Pass Management Yash Veer Jain work on the common holidays component for the admin and hr panel of the gate pass management system complete, Tomorrow will work on the department wise holiday and attendance page 11/12/2025 07:46 PM
Legal Draft Rahul Yadav Added place holder in new template doc file.. and tested. Done 11/12/2025 07:37 PM
Legal Draft Abhimanyu singh Work on the upload component Doing 11/12/2025 07:32 PM
HRMS Rashi Garg Today, I've updated the UI for the candidate journey, adding an option to select candidates.... Done 11/12/2025 07:31 PM
HRMS Priyanshi Jain Today I worked on the offer letter form, adding a salary structure component that auto-calculates annual salary based on monthly salary and vice versa. Also made changes according to fields from the API of creating offer letter. In progress 11/12/2025 07:30 PM
HRMS Shashank Vyas Today i worked on Candidate evaluation in Applicants module i made a interview page for the specific user to take interview and fill evaluation form for the candidate and added functionality to filter the previous evaluation for different interview based on interviewId. done 11/12/2025 07:29 PM
HRMS Pawanpreet Kaur Today, I worked on improving the HRMS feedback automation. I fixed the feedback email templates, updated the scheduler to run exactly at midnight, and added detailed logs for cycle execution. I corrected the feedback notification logic for 15/45/85-day cycles and resolved an issue in the GetTeamFeedback API where only one record was returning. I also tested multiple employee scenarios to confirm mail triggers, follow-ups, and notification updates. Done 11/12/2025 07:11 PM
HRMS Kashish varshney worked on onboarding module and make Issue apis done 11/12/2025 07:06 PM
HRMS Shreya Today I worked on employee module in which I made some changes accordingly and updated the controller Done 10/12/2025 09:10 PM
HRMS Aniket Today, I worked on the attendance module to calculate total work hours. As soon as the punch-out is recorded, the system calculates late-by and early-by timings according to the assigned shift, as well as the overtime based on shift rules Done 10/12/2025 09:00 PM
HRMS Aditya Today I worked on attendance module in which I also created an API . When an employee ID and date range are provided, it returns the complete attendance details for that specific employee. If the request is made without an employee ID, the API returns the attendance data for all employees within the given date range. Done 10/12/2025 08:58 PM
Legal Draft Shivam Kumar Fixed the service and API for bulk-adding fields using TemplateId, ensuring correct saving, mapping, and validation. Tested the full flow end-to-end to confirm fields are added properly without duplication or missing values. All changes completed 10/12/2025 08:53 PM
HRMS Mohit kaushal Today I worked on LOI and Evaluation module in which I made some changes and updated the code Done 10/12/2025 08:38 PM
Legal Draft Rahul Yadav Worked on login Api where i modified the Api to encrypt the credentials and for smoothly login also resolved the bugs Done 10/12/2025 07:31 PM
HRMS Priyanshi Jain Today I worked on create job post form to make it prefilled with data from job requests and made some changes. Also, created a form to collect data required for generating offer letter of selected candidate. The TA module will be completed by tomorrow and testing will be done on the day after tomorrow. In progress 10/12/2025 07:22 PM
HRMS Rashi Garg Today, I've updated the feedback in the canvas view of the candidate journey and integrated the edit API. I've also integrated APIs to select and retrieve candidates, and created a new page that displays all selected candidates....and also the TA module will be completed tomorrow, and we'll be testing it the day after tomorrow.... Done 10/12/2025 07:22 PM
HRMS Saloni Jain Today i worked on the it support module and create stock management page . done 10/12/2025 07:20 PM
HRMS Yash Veer Jain Working on onboarding module in which work on the feedback form and it support page Inprogress.try to complete this module by Friday 10/12/2025 07:18 PM
Content Research Souvik Mazumder Linkedin Content research Prepared a document with some new ideaswhich can be used for linkedin posting instead of the ones which was prepared previously 10/12/2025 07:11 PM
HRMS Ayush Tested ta module and discuss the flow of offer letter creation and also suggested changes in the ui. Complete the TA module on Friday (12/10/25) 10/12/2025 07:06 PM
HRMS Kashish varshney Worked on Onboarding Module and solve bugs Done 10/12/2025 07:02 PM
HRMS Shashank Vyas Today i started working on candidate evaluation section in candidate application module. done 10/12/2025 06:56 PM
HRMS Pawanpreet Kaur Today, I worked on the Onboarding Module where I have been working on the feedback email sending service It's in the progress it will be complete by Tommorow. In progress 10/12/2025 06:51 PM
Gate Pass Management Aniket Today I worked on get api in which filter was not working properly I fixed it and tested the api Done 09/12/2025 08:38 PM
HRMS Shreya Today I worked on Candidate journey in which I made some changes and added new APi Done 09/12/2025 08:37 PM
HRMS Mohit kaushal Today I worked on job request module in which I made new APIs and made some changes on LOI and fixed the bugs Done 09/12/2025 08:33 PM
HRMS Aditya Today I completed the shift section where I create tables of shift and shift log and handel update logic of shift logs Completed 09/12/2025 07:43 PM
HRMS Pawanpreet Kaur Today, I started working on the Onboarding Module, specifically on the automated feedback email service for new joinees. The service will send feedback forms to employees after 15, 45, and 85 days of joining, with submission tracking and follow-up emails if the forms are not completed. Implementation is in the initial stage. In progress 09/12/2025 07:01 PM
HRMS Priyanshi Jain Today I removed some fields from the job post dialog, fixed the status in the table, tested the TA module and fixed issues, and modified some fields on the onboarding form. In progress 09/12/2025 07:00 PM
HRMS Rashi Garg Today I fixed the approval and rejection APIs, created separate components for them, got the delete API created and implemented for interview schedule, and integrated APIs in Canvan view. Done 09/12/2025 06:59 PM
HRMS Kashish varshney Worked on It support Apis and solve bugs Done 09/12/2025 06:49 PM
HRMS Shashank Vyas today i work on applicant module ,fix ui and made changes in candidate journey. done 09/12/2025 06:28 PM
HRMS Saloni Jain Today i worked on the stock management of it support nd create 3 page avaiable stock , total stock , assigned stock done 09/12/2025 06:27 PM
HRMS Anshu Chauhan Today i fixed some bugs raised by QA in digital marketing panel and worked on the HR module of the HRMS. done 09/12/2025 06:22 PM
Content Research Sumeet Kumar Singh Content research for the month of the decemeber calender and prepare the image copy for the next day and draft the image and post copy and send it to pragya. NA 09/12/2025 06:12 PM
IT Admin and Support Prabhas Singh Vindhyaraj Windows Installed in Dell Latitude 5400 Laptop : Serial no 6Q9LTN2 Done 09/12/2025 05:27 PM
IT Admin and Support Prabhas Singh Vindhyaraj Servers backup power supply issue resolved Done 09/12/2025 04:35 PM
IT Admin and Support Prabhas Singh Vindhyaraj Inventory Sheet Updated Done 09/12/2025 04:26 PM
IT Admin and Support Deepak Resolve the user’s MS Teams login error by clearing cache, verifying credentials, and rechecking network connectivity Done 09/12/2025 04:24 PM
IT Admin and Support Deepak Resolve the guard room internet issue by checking router connectivity, cable/link status, and network configuration. Done 09/12/2025 04:23 PM
IT Admin and Support Prabhas Singh Vindhyaraj Discuss about Inventrory API with Kashish Dev Team: we share our requirements and changes. Done 09/12/2025 04:23 PM
IT Admin and Support Prabhas Singh Vindhyaraj Biometric Update of Durgesh and Vivek Done 09/12/2025 04:22 PM
IT Admin and Support Deepak Resolve the guard room internet issue by checking router connectivity, cable/link status, and network configuration. Done 09/12/2025 04:22 PM
IT Admin and Support Prabhas Singh Vindhyaraj Headset Assigned to Nishant and Tripta Done 09/12/2025 04:21 PM
IT Admin and Support Deepak Resolve the user’s internet issue by checking connectivity, router status, and network configuration. Done 09/12/2025 04:18 PM
IT Admin and Support Deepak Provide the user with a new laptop and ensure it is fully configured for use Done 09/12/2025 04:14 PM
IT Admin and Support Deepak Replace the user’s faulty charger and ensure the laptop is charging properly after replacement. Done 09/12/2025 04:12 PM
IT Admin and Support Deepak Check the router connectivity, verify all IP phones are registered and working, inspect the ATX unit for power/output issues, and ensure the UPS is functioning properly with stable backup and no error logs. Done 09/12/2025 04:00 PM
HRMS Aditya Today I worked on HRMS project Attendance module , I see the flow chart and table structure ,i research more about this module Done 08/12/2025 10:19 PM
IT Admin and Support Prabhas Singh Vindhyaraj Headset Assigned to Sumit NOC Team Done 08/12/2025 09:30 PM
IT Admin and Support Prabhas Singh Vindhyaraj Prepared PG Network Diagram Done 08/12/2025 09:22 PM
IT Admin and Support Prabhas Singh Vindhyaraj Pranjul Legal Team Laptop Replacement Request accepted and Prepared New Laptop. Done 08/12/2025 09:22 PM
IT Admin and Support Prabhas Singh Vindhyaraj Updated Assets Sheets Done 08/12/2025 09:20 PM
IT Admin and Support Prabhas Singh Vindhyaraj Install multiple Softwares in Shivam Dev Team Laptop as required Done 08/12/2025 09:20 PM
IT Admin and Support Prabhas Singh Vindhyaraj Add Dhara Singh (Housekeeping) in Biometric Done 08/12/2025 09:19 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolve Ayush Dev Team Laptop biometric Issue Done 08/12/2025 09:18 PM
Gate Pass Management Aniket Today I worked on get Api of attendance module in which I added the filters and added depoff and holidays module Done 08/12/2025 09:02 PM
HRMS Shreya Today I worked on Candidate journey and job posting in which I created new APIs and and some modifications in this Done 08/12/2025 09:00 PM
HRMS Mohit kaushal Today I worked on LOI module in which I created a new model and made a service for it and added in controller and changed format word to pdf automatically when Letter of intent is created Done 08/12/2025 08:35 PM
HRMS Clinton Laishram Create user attendance detail page. Added ui for analytic reports and charts for the user. Done 08/12/2025 07:44 PM
Legal Draft Abhimanyu singh Research and complete ui Doing 08/12/2025 07:32 PM
HRMS Kashish varshney Worked on Onboarding Module and make apis for HR and IT Support and solve bugs done 08/12/2025 07:07 PM
HRMS Ayush Discussed about the flow of the TA module Done 08/12/2025 07:02 PM
LMS Internal Panel Ayush Tested and shown demonstration to harsh sir about Routing Master Done 08/12/2025 07:01 PM
Legal Draft Shivam Kumar Tested complete document generation and edit flow end-to-end. Identified and fixed multiple bugs in version update and field mapping logic. Improved API consistency and verified document download behavior across different scenarios to ensure smooth functioning. All fixes completed. 08/12/2025 07:00 PM
HRMS Shashank Vyas Today i tested TA module fix UI in TA module and working on candidate journey . done 08/12/2025 06:58 PM
HRMS Rashi Garg Today I got new APIs created as per UI requirements, fixed issues with some APIs, and done research on candidate selection for onboarding. In progress 08/12/2025 06:57 PM
HRMS Priyanshi Jain Today I fixed errors in the employee table, updated the UI for the onboarding list, added uploaded documents, and included a documents checklist. Completed 08/12/2025 06:56 PM
HRMS Yash Veer Jain Work on the feedback form and complete the rm-add feedback component and working on the employee component for feedback form, Discuss the it section asset feaature and module to enable the functionality into it InProgress 08/12/2025 06:55 PM
HRMS Saloni Jain Today i worked on the preboarding form And fix some issues of Preboarding checklist & discuss about the it support module in hrms done 08/12/2025 06:52 PM
HRMS Anshu Chauhan Today i gave the demonstration of marketing panel to the Marketing manager and fix the bugs that were by QA in the first half and in the second half worked on the onboarding section of HR module. done 08/12/2025 06:49 PM
Content Calendar Seema Kumari ppt Research design for ppt, Prepare the ppt- Currently in progress and 08/12/2025 06:49 PM
Content Research Souvik Mazumder HR Induction PPT content update Content updation is in progress and final changes will be made in the same document for final implementation 08/12/2025 06:47 PM
Content Calendar Mohit Kumar done done 08/12/2025 06:47 PM
Social Media Creatives Mohit Kumar working na 08/12/2025 06:47 PM
Content Research Souvik Mazumder Changes in content previously finalised for December calendar for Linkedin, also accompanied with daily LinkedIn posting Changes have been researched and relevant topics have been shared 08/12/2025 06:45 PM
HRMS Pawanpreet Kaur Today, I worked on the Onboarding Module Where I worked on the Employee code generation and make changes in the feedback Api's and added the new functionality in it. Done 08/12/2025 06:43 PM
IT Admin and Support Deepak Changed the user’s Outlook password and confirmed successful login access. Done 08/12/2025 04:02 PM
IT Admin and Support Deepak Updated the user’s laptop drivers and verified the system is running smoothly after the update. Done 08/12/2025 04:01 PM
IT Admin and Support Deepak Enabled the user’s fingerprint authentication and verified successful login functionality. Done 08/12/2025 03:59 PM
IT Admin and Support Deepak Enabled the user’s fingerprint authentication and verified successful login functionality. Done 08/12/2025 03:58 PM
IT Admin and Support Deepak Replaced the user’s laptop, completed the setup/configuration, and ensured everything is functioning properly. Done 08/12/2025 03:57 PM
IT Admin and Support Deepak Replaced the SSD, configured it properly, and verified the system is working smoothly. Done 08/12/2025 03:56 PM
IT Admin and Support Deepak Resolved the user’s laptop issue by diagnosing the problem, performing necessary troubleshooting steps, and confirming proper system functionality after the fix. Done 08/12/2025 03:55 PM
IT Admin and Support Deepak Issued the headphone to the user, verified its working condition, and documented the issuance for record. Done 08/12/2025 03:54 PM
IT Admin and Support Deepak Checked the router to ensure it is working properly. Done 08/12/2025 03:53 PM
IT Admin and Support Deepak Checked the biometric online status and downloaded the logs. Done 08/12/2025 03:51 PM
IT Admin and Support Deepak Set the password in the printer and confirmed it is applied successfully. Done 08/12/2025 03:51 PM
IT Admin and Support Deepak Diagnosed the UPS bypass error, checked input/load/battery, and resolved the issue. Done 08/12/2025 03:44 PM
ServiceResumeReader Aditya Today I worked on the completing the resumereader and done some changes in the service both service is tested and Live Done 05/12/2025 08:55 PM
HRMS Mohit kaushal Today I worked on Candidate journey in which I added new APIs and worked on jon request module in which I made some updation Done 05/12/2025 08:26 PM
HRMS Shreya Today I worked on job posting module in which I added new APIs and made some changes in APIs Done 05/12/2025 08:21 PM
HRMS Ayush Discuss the flow TA module and start working on it. In-progress 05/12/2025 07:46 PM
LMS Internal Panel Ayush Fix the image issue and tested the routing master panel and bulk and operator based routing. Done 05/12/2025 07:45 PM
HRMS Clinton Laishram Working on attendance module. Created shift management page. in this admin or manager can create and assigned shift to employee. on Progress 05/12/2025 07:37 PM
Legal Draft Abhimanyu singh Work on dashboard Doing 05/12/2025 07:31 PM
HRMS Rashi Garg Today, I created the approval interface, integrating the RM request API, as well as the approval and rejection APIs. I've also resolved all the bugs that were coming up.... Done 05/12/2025 07:17 PM
HRMS Priyanshi Jain Today I created a page for onboarding candidates and integrated APIs in it, also fixed issues on referral, candidate application, and job request pages in TA module.. Completed 05/12/2025 07:15 PM
HRMS Kashish varshney Worked on HR task Tracker Apis and discuss IT support model and solve bugs Done 05/12/2025 07:13 PM
Legal Draft Shivam Kumar Implemented document versioning and enabled editing of previously generated documents. Updated workflow now regenerates files with new versions and returns improved API response including file path and download URL. Added a standardized DTO for cleaner output. Overall flow is now smoother and stable. All tasks completed and code pushed successfully. 05/12/2025 07:01 PM
Digital marketing panel Anshu Chauhan worked on the user creation section of admin panel and did the testing of the panel. done. 05/12/2025 06:52 PM
HRMS Shashank Vyas Today i work on TA module and Applicant module fix UI of applicant modules filter section ,add API's for dropdown list in job titles and department fields in filter section of all pages in applicants module and made same changes in filter section of job post list page . done 05/12/2025 06:52 PM
HRMS Saloni Jain Today i create the preboarding form nd preboarding checklist ui nd integrate it with api done 05/12/2025 06:51 PM
HRMS Pawanpreet Kaur Today , I worked on the Onboarding Module where I have done some changes in the Apis for the Preboarding and Feedback form according to frontend , And also Started the work on feedback form sending email service Done 05/12/2025 06:31 PM
Mokshu Website Yash Veer Jain Complete the required changes and add on the component on the request of digital marketing team and also live the changes and check it also Done 05/12/2025 04:29 PM
Social Media Creatives Mohit Kumar next week all post don done 05/12/2025 04:26 PM
HRMS Yash Veer Jain work on the feedback form for the rm in onboarding module InProgress 05/12/2025 04:24 PM
IT Admin and Support Prabhas Singh Vindhyaraj Discuss and Explain about panel requirement to Kashish from Dev Team Done 05/12/2025 03:49 PM
IT Admin and Support Prabhas Singh Vindhyaraj Try Custom Win 11 Enterprise in VM Workstation Testing 05/12/2025 03:47 PM
IT Admin and Support Prabhas Singh Vindhyaraj Headset Assigned to Kashish Dev Dept Done 05/12/2025 03:46 PM
IT Admin and Support Prabhas Singh Vindhyaraj Assets Form Submission and Mail to respective users regarding Assets Allocation Done 05/12/2025 03:45 PM
IT Admin and Support Prabhas Singh Vindhyaraj Assigned Laptop to New User:- Durgesh and Vivek of NOC Dept Done 05/12/2025 03:44 PM
IT Admin and Support Prabhas Singh Vindhyaraj Status Check of Biometric, IP phone, ATS, UPS, Cloud Done 05/12/2025 03:42 PM
HRMS Pawanpreet Kaur Today, I worked on the Preboarding module. I implemented the document selection flow where HR can choose specific documents, select all documents, or add extra dynamic fields. I updated the API to merge all selected fields, remove duplicates, save them in the checklist, and return the final task list with the candidate ID for the frontend. Done 04/12/2025 08:47 PM
ServiceResumeReader Aditya Today, I worked on the resumeReader service in the whatsapp , i createed a telegrambot and generate a Qr and send it to a a channel after scanning qr i read pdf and docs from the whatsapp Done 04/12/2025 08:43 PM
HRMS Mohit kaushal Today I worked on job request module in which I added new APIs and made changes in post api and made some changes in documentation upload Done 04/12/2025 08:31 PM
HRMS Shreya Today I worked on Candidate Application module in which I made some changes added new APIs and updated the controller Done 04/12/2025 08:30 PM
LMS Internal Panel Shreya Today I worked on Routing module in which I made some changes in APIs and updated the controller Done 04/12/2025 08:29 PM
Digital Marketing Panel Priyanshi Jain Today I fixed the issues and also improve the ui of the post copy dialog Completed 04/12/2025 08:04 PM
HRMS Rashi Garg Today, I understood the candidate journey workflow and integrated it, but there were some issues with the APIs, so I've asked to get them fixed. I've also resolved the issues with the previous APIs.... Done 04/12/2025 08:00 PM
HRMS Clinton Laishram Working on ui component attendance module. Added the functionality to check in through camera capture for remote worker. Added ui component for late check in and other analytic charts on Progress 04/12/2025 07:39 PM
Legal Draft Abhimanyu singh Design component Doing 04/12/2025 07:36 PM
HRMS Kashish varshney Worked on Onboarding Module and discuss HR task Tracker apis Done 04/12/2025 05:58 PM
ServiceResumeReader Aditya Today I tested Resume Reader after testing I live it on IIS it is working fine Completed 03/12/2025 08:18 PM
IT Admin and Support Deepak Installed all necessary drivers on the laptops to ensure proper functioning of hardware and software. Done 03/12/2025 08:18 PM
IT Admin and Support Deepak Windows has been installed on multiple laptops, all systems have been properly configured, and necessary updates and drivers have been applied to ensure smooth operation. Done 03/12/2025 08:17 PM
IT Admin and Support Deepak Issued the headphone to the user. Done 03/12/2025 08:16 PM
IT Admin and Support Deepak Created multiple users in the domain and completed all required configurations. Done 03/12/2025 08:15 PM
Gate Pass Management Aniket Today I added new api of attendance count in which present day absent day and week off are calculated with common holidays Done 03/12/2025 08:13 PM
IT Admin and Support Deepak Filled the form for the user regarding asset details. Done 03/12/2025 08:13 PM
LMS Internal Panel Shreya Today I worked on vendor mapping module in which I added new api and update the controller Done 03/12/2025 08:12 PM
IT Admin and Support Deepak Prepared and configured the new laptop for the user and updated all required drivers Done 03/12/2025 08:11 PM
IT Admin and Support Deepak Changed the network connection from BSNL to Airtel for proper and stable working. Done 03/12/2025 08:09 PM
IT Admin and Support Deepak The user’s WhatsApp issue has been checked and successfully resolved. Done 03/12/2025 08:08 PM
IT Admin and Support Deepak A new user login ID has been created and configured successfully. Done 03/12/2025 08:06 PM
IT Admin and Support Deepak The user login verification issue has been checked and successfully resolved. Done 03/12/2025 08:05 PM
IT Admin and Support Deepak The user’s network issue has been thoroughly checked and resolved. Connectivity has been restored and the system is now working properly. Done 03/12/2025 08:04 PM
IT Admin and Support Prabhas Singh Vindhyaraj Inventory Sheet Updated Done 03/12/2025 08:04 PM
IT Admin and Support Prabhas Singh Vindhyaraj Laptop Ready for NOC User Done 03/12/2025 08:03 PM
IT Admin and Support Deepak Share the complete asset details for the user at the earliest. Done 03/12/2025 08:02 PM
IT Admin and Support Prabhas Singh Vindhyaraj Mouse Alloted to Prince Done 03/12/2025 08:01 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolved Ravi Kumar Mayigowda Sir laptop touchpad issue Done 03/12/2025 08:01 PM
IT Admin and Support Prabhas Singh Vindhyaraj Created Jio Network Architecture in draw.io and converted to PDF Done 03/12/2025 08:00 PM
IT Admin and Support Prabhas Singh Vindhyaraj Check Headset Quality and found 2 headset has some issue. Done 03/12/2025 07:59 PM
IT Admin and Support Prabhas Singh Vindhyaraj Regular Check Of Biometric, ATS, UPS, Iphone Status Done 03/12/2025 07:58 PM
Legal Draft Shivam Kumar Implemented secure login flow with unified error handling. Refactored login controller to return clean 401 responses and optimized LoginResponseDto with conditional JSON output. Added feature to store field and key-value pairs from generated documents. Verified basic security checks and tested all failure scenarios. Till here completed. 03/12/2025 07:54 PM
HRMS Clinton Laishram Working of components for attendance model. Creating attendance dashboard for hr and admin role. on Progress 03/12/2025 07:49 PM
Legal Draft Abhimanyu singh Work on component Doing 03/12/2025 07:32 PM
Digital Marketing Panel Priyanshi Jain Today I made the required changes in the multistep form of add posts, fixed the issue in the remarks section across modules, and also resolved the calendar issue. In progress 03/12/2025 07:14 PM
HRMS Rashi Garg Today I created a new page for interview schedule, calls, and evaluation today, built the candidate overview tab, fixed functionality, and integrated the candidate journey API. In progress 03/12/2025 07:13 PM
HRMS Kashish varshney Worked on Onboarding Module and discuss preboarding form Apis Done 03/12/2025 07:11 PM
HRMS Kashish varshney Worked on Onboarding Module and discuss preboarding form Apis Done 03/12/2025 07:11 PM
HRMS Kashish varshney Worked on Onboarding Module and discuss preboarding form Apis Done 03/12/2025 07:11 PM
HRMS Kashish varshney Worked on Onboarding Module and discuss preboarding form Apis Done 03/12/2025 07:11 PM
Gate Pass Management Yash Veer Jain Worked on understanding and documenting the new requirements added to the project. InProgress 03/12/2025 07:03 PM
Digital Marketing Panel Pawanpreet Kaur Today, I made some api's in Post Approval Module and fix some api's Done 03/12/2025 07:01 PM
Content Calendar Seema Kumari Design PPT - Corporate Desk and create birthday post Research design for ppt, Prepare the ppt- Currently in progress and Research design for birthday post 03/12/2025 07:00 PM
HRMS Pawanpreet Kaur Today , I made some changes in the feedback api's and will make the changes in the preboarding Form as per the HR discussion So It will be done Tommorow Done 03/12/2025 06:59 PM
HRMS Yash Veer Jain I worked on the onboarding module of the hrms project in which i clarify the fields of the project of onboarding form and also discuss with hr team regarding some fields InProgress 03/12/2025 06:59 PM
Content Research Souvik Mazumder Corporate and HR Induction PPT content research, Content for December 2nd week Researched content and sent items for approval 03/12/2025 06:59 PM
LMS Internal Panel Ayush Integrated APIs in operator routing and also added one new role in the Internal Panel where user can edit/delete the routing or raise the routing request also Done 03/12/2025 06:56 PM
GatePass (App) Shashank Vyas Worked on remote desktop system, set up and ran the project, resolved emulator issues, and prepared the app for QA testing done 03/12/2025 06:55 PM
HRMS Saloni Jain Today i work on the onboarding check list module ui , nd integrate it with api done 03/12/2025 06:48 PM
Digital marketing panel Anshu Chauhan Today i worked focusing on fixing various UI and functionality bugs while also improving the overall responsiveness of the application. I corrected layout alignment issues, refined spacing and typography, and ensured consistent visuals across different components. Several functional issues were resolved, including broken click events, data-loading problems, and bugs related to filtering, sorting, navigation, and redirections. done 03/12/2025 06:48 PM
HRMS Mohit kaushal Today I worked on Candidate Documents module in which I added new field and updated the controller as according to the fields and made some changes in APIs Done 03/12/2025 06:46 PM
LinkedIn Banner Mohit Kumar this week post working 03/12/2025 06:45 PM
ID Card Design Mohit Kumar id card done 03/12/2025 06:44 PM
Content Research Sumeet Kumar Singh Woking on corporate intro deck content and next week of linkedlin post content. Draft a image and post copy and send it to pragya. na 03/12/2025 06:35 PM
Gate Pass Management Aniket Today I added new model of departmentholiday and holiday in which I performed CRUD and updated the database Done 02/12/2025 09:01 PM
LMS Internal Panel Shreya Today I was working on operator wise routing status in which I updated the APIs and added new APi Done 02/12/2025 08:58 PM
HRMS Pawanpreet Kaur In HRMS, I worked on the feedback API, updated some onboarding APIs, and reviewed the employee code/status field mappings. Done 02/12/2025 08:45 PM
Digital marketing panel Pawanpreet Kaur Today in the Digital Marketing module, I created APIs for creative upload and get (view/download) and also implemented multiple-images download functionality. Done 02/12/2025 08:40 PM
Legal Draft Shivam Kumar Added soft-delete functionality for Templates in the service layer, enabling logical deletion without losing historical data. Implemented BankField service for managing dynamic bank-related fields within templates. Performed flow testing to ensure updated template states reflect correctly during form submission and document generation. Services updated successfully and basic testing done. Will continue integration work next. 02/12/2025 08:20 PM
HRMS Mohit kaushal Today I worked on offer letter module in which I worked on email section and added file attachments in the email section Done 02/12/2025 08:07 PM
Legal Draft Abhimanyu singh APIs changed, redo work Doing 02/12/2025 07:55 PM
HRMS Clinton Laishram Complete account page creation along with api integration. In this it will show all the user basic details, along its employee details, contact, bank details and documents uploaded. Done 02/12/2025 07:53 PM
ServiceResumeReader Aditya Today I completed this service of resume reader and write the details in the excel I use graph api to write the data Done 02/12/2025 07:20 PM
HRMS Kashish varshney Add service in onboarding checklist and solve bugs or some discussion with hr for preboarding Done 02/12/2025 07:14 PM
HRMS Rashi Garg Today I created a form for interview scheduling, designed its UI for panel display, and also created a feedback form. Completed 02/12/2025 07:11 PM
Content Research Souvik Mazumder Research content for PPT- corporate deck and induction PPT Completed the research and shared content, work in progress 02/12/2025 07:05 PM
IT Admin and Support Prabhas Singh Vindhyaraj Printer Toner troubleshoot solution entered in word done 02/12/2025 07:03 PM
HRMS Priyanshi Jain Today I created leave page and broadcast page for HR and assets request page. Also, made changes in the UI of employee dashboard and also fix the error in edit form of employee table Completed 02/12/2025 07:03 PM
Content Calendar Seema Kumari Research design for PPT- Corporate Deck Researched design, images and templates and prepared the PPT, currently in progress 02/12/2025 07:02 PM
IT Admin and Support Prabhas Singh Vindhyaraj Headset Tested and found one has issue such as cracking sound Done 02/12/2025 07:01 PM
Social Media Creatives Seema Kumari ppt na 02/12/2025 07:01 PM
Gate Pass Management Yash Veer Jain Understand the new requirements from the hr team and discuss within team to start working on it InProgress 02/12/2025 07:00 PM
IT Admin and Support Prabhas Singh Vindhyaraj BSNL Network Architecture Updated Done 02/12/2025 07:00 PM
IT Admin and Support Prabhas Singh Vindhyaraj Chandan from Accounts Printer issue resolved Done 02/12/2025 07:00 PM
HRMS Saloni Jain Today i worked on the preboarding form ui Processing 02/12/2025 06:59 PM
IT Admin and Support Prabhas Singh Vindhyaraj Hitesh Sir C drive storage issue resolved Done 02/12/2025 06:59 PM
Content Calendar Mohit Kumar this week post done na 02/12/2025 06:59 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolved Teams metting join issue for Anshu Dev Team Done 02/12/2025 06:58 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolved Outlook and Teams Login issue Mayuri NOC Done 02/12/2025 06:57 PM
Content Research Sumeet Kumar Singh Working on December Month Calender and Draft a image and post copy and sent it to pragya for the approval. na 02/12/2025 06:47 PM
Digital marketing panel Anshu Chauhan completed birthday module. completed it ui and integrated api for download image and upload creative. done 02/12/2025 06:44 PM
IT Admin and Support Prabhas Singh Vindhyaraj Find and assigned misplaced assets to NOC Few Users queries left 01/12/2025 09:30 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolved Many Queries related to outlook for legal Done 01/12/2025 09:29 PM
IT Admin and Support Prabhas Singh Vindhyaraj Check new Headset working properly or not Done 01/12/2025 09:28 PM
IT Admin and Support Prabhas Singh Vindhyaraj Assign temp laptop to Shivam from Dev Team and Installed software required Done 01/12/2025 09:27 PM
IT Admin and Support Prabhas Singh Vindhyaraj Provide outlook and teams password to user. Done 01/12/2025 09:26 PM
IT Admin and Support Deepak Received the headphones and checked all units for proper working. Done 01/12/2025 09:19 PM
IT Admin and Support Deepak Resolved the user’s laptop display issue by checking hardware connections and updating display drivers. Done 01/12/2025 09:17 PM
Legal Draft Abhimanyu singh Test apis Doing 01/12/2025 09:11 PM
IT Admin and Support Deepak Resolved the user's MS 365 issues by repairing the apps and reconfiguring the account. Done 01/12/2025 08:52 PM
IT Admin and Support Deepak Resolved multiple users’ Outlook password issues by resetting credentials and reconfiguring their accounts successfully. Done 01/12/2025 08:51 PM
Digital Marketing Panel Aniket Today I worked on employee model in which I added new field and updated the database and fetched birthday from dob of present month and next month and made their APIs and added view and download api of profile photo Done 01/12/2025 08:27 PM
LMS Internal Panel Shreya Today I worked on internal panel in which I added new model of vendor and made its APIs and excel upload api and worked on operator routing in which I worked on controller action Done 01/12/2025 08:24 PM
HRMS Mohit kaushal Today I worked on TA module in which I generated offer letter and made template of this In progress 01/12/2025 08:13 PM
Legal Draft Shivam Kumar Implemented fixed-file-per-template logic to ensure document generation always uses the latest uploaded template. Updated UploadTemplateAsync with dual saving (GUID history + fixed filename overwrite) and improved file path handling in GenerateDocumentStreamAsync. Tested end-to-end flow from upload → overwrite → document generation to ensure latest template is applied. Document generation stable and reflecting latest uploaded template. Further improvements (UPSERT & logging) planned next. 01/12/2025 08:07 PM
RN_Mail_Reader Aditya Today, I work on Service Of Resume Reader . fetch data from the Resume is completed and I focus on how to write data on excel through sharepoint Done 01/12/2025 07:34 PM
HRMS Clinton Laishram Working on employee module component (hr view). Improve the ui for employee listing and other chart component. Integrating all employee api. on Progress 01/12/2025 07:28 PM
HRMS Kashish varshney Worked On Onboarding checklist Apis and some fields change in model and also worked on HR task Tracker apis Done 01/12/2025 07:21 PM
Digital Marketing Panel Pawanpreet Kaur Today , In Content Calendar Module I have done some changes in api's according the need from frontend and tested it. Done 01/12/2025 07:18 PM
HRMS Pawanpreet Kaur Today, In Onboarding Module I have done some changes in api's according the review from HR and tested the all Apis. And add functionality to upload a resume then extract the basic info from resume and store in Candidate application table Done 01/12/2025 07:16 PM
LMS Internal Panel Ayush Make form for operator based routing and modify the sidebar for making new role in the panel. Done 01/12/2025 07:09 PM
HRMS Yash Veer Jain Understand the onboarding module Inprogress 01/12/2025 07:01 PM
Gate Pass Management Yash Veer Jain Live both frontend & Backend of gate pass done with clinton sir 01/12/2025 07:00 PM
Gate Pass Management Yash Veer Jain fix the edit issue of location in hr employee module done 01/12/2025 06:59 PM
HRMS Saloni Jain Today i worked on the onboarding module and create task assign component . done 01/12/2025 06:46 PM
Content Research Souvik Mazumder Find alternative options for the 1st week of December Provided alternate ideas, sent for approval 01/12/2025 06:45 PM
Content Research Souvik Mazumder Content Research for December Calendar Topics and LinkedIn POsting Completed the assisgned and replaced content for the first week of December and completed posting of the same 01/12/2025 06:44 PM
Digital marketing panel Anshu Chauhan Fixed bugs raised on the panel and worked on the Birthday module and integrated apis of the same module. Inprogess 01/12/2025 06:43 PM
Content Calendar Sumeet Kumar Singh Working on December Month Calender. Draft a image and post copy for this week of post. Analyzing the performing post in the linkedln page. na 01/12/2025 06:42 PM
HRMS Clinton Laishram Worked on ui component for payroll page. creating graph and table components for payroll page on Progress 27/11/2025 07:41 PM
Legal Draft Abhimanyu singh Get component More than half done 27/11/2025 07:33 PM
IT Admin and Support Rahul Pradhan Get a rack server ready with the help to Deepak. Done 27/11/2025 12:20 PM
IT Admin and Support Deepak Created an Excel sheet for tracking and managing all issued headphones with complete details. Done 27/11/2025 11:50 AM
IT Admin and Support Deepak Installed the required drivers on the user’s laptop and ensured all hardware components were functioning properly Done 27/11/2025 11:46 AM
IT Admin and Support Deepak Checked the IP phone and resolved the reported issues, inspected the ATX and UPS status, and downloaded the biometric logs for verification. Done 27/11/2025 11:42 AM
IT Admin and Support Deepak Resolved the internet issue by checking router connectivity, verifying network settings, and ensuring stable access for the user. Done 27/11/2025 11:40 AM
IT Admin and Support Deepak Checked the router to ensure it is functioning properly, verified network connectivity, signal stability, and confirmed that all indicators and settings are working as expected. Done 27/11/2025 11:39 AM
IT Admin and Support Rahul Pradhan Portered a laptop to the location share to me by Huuny Sir, with the help of Admin team. Done 27/11/2025 10:52 AM
IT Admin and Support Rahul Pradhan Internet from BSNL at building went down form ISP end, so shifted it to Airtel and after getting restored again shifted to BSNL again as it is our primary source of internet. Done 27/11/2025 09:48 AM
IT Admin and Support Prabhas Singh Vindhyaraj Camera cable marking of 6th floor Partial Done 26/11/2025 09:48 PM
IT Admin and Support Prabhas Singh Vindhyaraj Add Lapcare Multimedia Headset to LMS Tower/Headset Sheet 21 Headset Done 26/11/2025 09:15 PM
IT Admin and Support Prabhas Singh Vindhyaraj Boot Windows 10 in Pranjul from Legal old Laptop Done 26/11/2025 09:13 PM
IT Admin and Support Prabhas Singh Vindhyaraj Replaced Admin IP phone as per required Done 26/11/2025 09:07 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolved Heating and Slow System issue of Ayush from Dev Team Done 26/11/2025 09:06 PM
IT Admin and Support Prabhas Singh Vindhyaraj Resolved Printer issue of Chandan Accounts Dept Done 26/11/2025 09:05 PM
IT Admin and Support Prabhas Singh Vindhyaraj Updated Laptop Sheet : add Lenovo Laptops, Microsoft surface and Dell Victus Done 26/11/2025 09:04 PM
Legal Draft Abhimanyu singh Setup folder structure and begin work on component Done 26/11/2025 08:42 PM
HRMS Aniket Today I worked on DWR project in which I worked on testing of all the modules with three roles admin,Manager,User there were some bugs which I fixed and tested email sevice for sending Reports Done 26/11/2025 08:31 PM
HRMS Shreya Today I worked on HRMS in Candidate Application module in which I added new fields and added that fields in database and updated the controller with new fields Done 26/11/2025 08:29 PM
HRMS Mohit kaushal Today I worked on interview schedule module in which I made changes in APIs and updated the email service Done 26/11/2025 08:06 PM
Legal Draft Shivam Kumar Edited Templates and added dynamic placeholders to support automated replacement during document generation. Worked on improving the document generation flow to ensure correct value mapping and output generation. Tested placeholder replacement to verify accuracy in the final generated document. Completed till here. 26/11/2025 07:53 PM
HRMS Clinton Laishram Working on code review of employee modules. As well as code review for gatepass project. Working on overall sidebar option for each module. Also find the ui structure for attendance and payroll module. Done 26/11/2025 07:51 PM
HRMS Yash Veer Jain Test the dwr module and also fix the timing issue Inprogress 26/11/2025 07:38 PM
RN_Mail_Reader Aditya Today I worked on resume field detector I also fetch all field which is necessary yesterday I work on test this resume by uploading resume one by one IN PROGRESS 26/11/2025 07:38 PM
Gate Pass Management Yash Veer Jain Complete the hr panel and attendence module qlas per the requirement from hr team Done. 26/11/2025 07:37 PM
HRMS Pawanpreet Kaur Today I worked on the Onboarding module. I updated and modified the required APIs and made changes to support the Preboarding Form. I also worked on the New Joiner checklist, where tasks will be assigned to new employees, and added the necessary details and structure for those tasks. Done 26/11/2025 07:32 PM
Content Research Souvik Mazumder 1st week content for image copy and post copy Shared the content and proceeded after approval 26/11/2025 07:24 PM
Content Research Souvik Mazumder Brochure for SIGMA SOUTH ASIA Initial content sorted, need to present the remaining in chronology 26/11/2025 07:21 PM
HRMS Rashi Garg Today I worked on call order and interview schedule but put it on hold due to an issue in the apis... Also, integrated APIs in the evaluation form. Inprogress 26/11/2025 07:13 PM
HRMS Priyanshi Jain Today I created pages for leave requests, attendance, salary, and assets in the employee module,in which employees can view their details. Completed 26/11/2025 07:12 PM
HRMS Kashish varshney Worked on Onboarding Module and make HR task Tracker Apis and solve bugs and discuss models Done 26/11/2025 07:06 PM
HRMS Saloni Jain Today i test the dwr panel , fix some bugs done 26/11/2025 07:02 PM
HRMS Anshu Chauhan Today i worked on the onboarding module, worked on the preboarding section completed its form and add all the functionality as per the flow , integrated all api. and also worked on the forgot password section. Working on it 26/11/2025 06:59 PM
GatePass (App) Shashank Vyas Today I added internal employees to the gate pass app, fixed the gate pass UI, and resolved sync logic for internal employees. I also improved attendance data handling, optimized API integration, enhanced offline stability, and tested overall application performance. done 26/11/2025 06:57 PM
LinkedIn Banner Mohit Kumar all done na 26/11/2025 06:52 PM
Content Calendar Sumeet Kumar Singh Sharing the image copy and post content of 1st week of December na 26/11/2025 06:32 PM
IT Admin and Support Deepak Added the required features in the server domain and successfully installed the Printer & Documentation services. Done 26/11/2025 04:24 PM
IT Admin and Support Deepak Installed the required drivers on the user systems and verified they are functioning properly. Done 26/11/2025 04:24 PM
IT Admin and Support Deepak I have shared the iOS file with the teammate as requested and ensured that they have received it successfully. Done 26/11/2025 04:18 PM
IT Admin and Support Deepak User’s Excel issue has been resolved and the password has been reset. Done 26/11/2025 01:51 PM
IT Admin and Support Deepak New desktop has been checked and is working properly. Done 26/11/2025 01:47 PM
IT Admin and Support Deepak New Victus laptop has been checked and is working properly. Done 26/11/2025 01:46 PM
IT Admin and Support Deepak Changed the user’s IP extension and updated the network configuration. Done 26/11/2025 01:20 PM
IT Admin and Support Deepak Download and installed the required scanner software on the user’s laptop. done 26/11/2025 10:42 AM
IT Admin and Support Deepak Shared the SSD shipment tracker ID with the user for real-time tracking. Done 26/11/2025 10:16 AM
IT Admin and Support Deepak Checked router functionality including power, WAN status, LAN connectivity, ping test, and overall network performance. Done 26/11/2025 10:12 AM
HRMS Mohit kaushal Today I changed email content of all the modules in which email is used and worked upon call order module in which I updated the controller Done 25/11/2025 09:04 PM
IT Admin and Support Prabhas Singh Vindhyaraj SLA and KRA prepared and shared to IT Admin for changes required. Done 25/11/2025 08:50 PM
IT Admin and Support Prabhas Singh Vindhyaraj Add Uptime Solution in Troubleshoot docs. Done 25/11/2025 08:48 PM
IT Admin and Support Prabhas Singh Vindhyaraj Updated Mini PC and Mouse Inventory Sheet Done 25/11/2025 08:47 PM
HRMS Aniket Today I worked on DWR module and made service for sending reports to manager and admin and tested project and project allotment module Done 25/11/2025 08:38 PM
IT Admin and Support Prabhas Singh Vindhyaraj Handover mouse to Kashish and received response in mail Done 25/11/2025 08:38 PM
IT Admin and Support Prabhas Singh Vindhyaraj Updated Adapter Sheet: After check working Done 25/11/2025 08:37 PM
HRMS Shreya Today I worked on candidates application module in which I made changes in APIs and implemented new fields in model and added fields in Database and updated the controller Done 25/11/2025 08:36 PM
IT Admin and Support Prabhas Singh Vindhyaraj Updated Laptop and Abandon Laptop Inventory Sheet: Noted Serial no of working laptop Done 25/11/2025 08:36 PM
RN_Mail_Reader Aditya Today I work on hr resume service i extract 4 filed and 1 job title is remaining In progress 25/11/2025 08:09 PM
Legal Draft Shivam Kumar Worked on document generation logic using TextTemplateService, added placeholder-based replacement ({{FieldKey}}) using latest form submission data, prepared sample Word templates with dynamic fields, and implemented GUID-based file saving for downloads. Core logic drafted, document generation module is still in progress. 25/11/2025 07:56 PM
IT Admin and Support Rahul Pradhan Added Guest SSId to both the Access points on 7th and 8th floor with internet access only. Done 25/11/2025 07:54 PM
Legal Draft Abhimanyu singh Work on get component Done 25/11/2025 07:32 PM
HRMS Clinton Laishram Create user details page. Added user details in section by section like, personal details section, address section, contact information, etc. Done 25/11/2025 07:28 PM
HRMS Rahul Yadav Worked on permission module to show the module and sub module data with view create edit and also made Authorization based user to insert the user in database Done 25/11/2025 07:27 PM
HRMS Priyanshi Jain Today I worked on the HR dashboard, fixed its UI, and created a page for employee details that's accessible from the HR dashboard. Completed 25/11/2025 07:08 PM
HRMS Rashi Garg Today I integrated address APIs, applied filters in job posts, created a form in call order, and integrated APIs in it. Inprogress 25/11/2025 07:08 PM
HRMS Kashish varshney Worked on Onboarding Module and make models of IT Support Asset , IT Asset Issue,HR Task Tracker and other done 25/11/2025 07:02 PM
HRMS Pawanpreet Kaur Today, candidate preboarding and onboarding modules were enhanced. APIs for fetching/updating preboarding forms, removing/updating candidate documents, and acknowledging multiple candidates were implemented. Email notifications were set up for candidates and their department Managers/Admins with candidate name, email, and job title. Employee onboarding logic, including transferring documents and addresses, was completed. Preboarding checklist submission now triggers emails to HR with task lists and candidate details. The first-week tracker and task assignment feature is currently in progress. Done 25/11/2025 07:01 PM
Gate Pass Management Yash Veer Jain Start Working on the Hr Panel to add the location field at every location and attendance module In Progress 25/11/2025 07:00 PM
Gate Pass Management Yash Veer Jain Start Working on the Hr Panel to add the location field at every location and attendance module In Progress 25/11/2025 07:00 PM
GatePass (App) Shashank Vyas Today i solve the bug in employee attendance page. its showing error while midnight sync functionality . changed the endpoint in employee attendance page to fetch the employee list . also solve error in pending checkout page . done 25/11/2025 07:00 PM
Gate Pass Management Yash Veer Jain Complete the User panel and add new tab for internal employees and also replace the api's Done 25/11/2025 06:58 PM
Digital marketing panel Anshu Chauhan ChatGPT said: Today, I conducted a detailed demo of the Digital Marketing Panel for the marketing team, where I explained the features, workflow, and overall functionality of the system. During the session, the team provided useful feedback, including several UI improvements, changes, and additional functionalities they would like to see implemented. After gathering their suggestions, I began working on the requested updates, focusing primarily on modifying and improving the user interface to enhance user experience. I also started implementing some of the add-on functionalities based on their requirements. Working on it. 25/11/2025 06:52 PM
HRMS Saloni Jain Today i worked on the testing of the dwr panel, added some functionalities on the ui of the dwr panel done 25/11/2025 06:44 PM
Content Calendar Sumeet Kumar Singh Working on December Month Calender. na 25/11/2025 06:32 PM
Content Research Sumeet Kumar Singh Sharing the post copy this week. Draft a image and post copy in the pdf and send it to souvik for the approval. NA 25/11/2025 06:30 PM
IT Admin and Support Deepak Checked router functionality and confirmed proper working. Downloaded biometric logs and created biometric backup. Prepared 5th floor camera marking sheet with accurate location details. Checked IP phone, ATX, and UPS status. Created new user in the domain and onboarded workstation. Resolved domain relationship issues between systems. Updated required drivers on user laptop. Applied new wallpaper via domain policies. Checked user laptop performance and resolved reported issues. Added new user to the domain successfully. Tagged all mini PCs and verified working status. Configured RAID and installed Windows Server. Done 25/11/2025 04:18 PM
IT Admin and Support Rahul Pradhan The servers given to Rambillash had gone down, so I have reinstalled a fresh OS on both systems from scratch and also configured RAID 1 for disk failure protection. I have documented all details (IP, username, password, Anydesk ID & password) and shared them with you and Rambillash ji. Done 25/11/2025 03:40 PM
IT Admin and Support Rahul Pradhan Again I have given access to Rambilash for the 3 servers he has been working on (DC, Node-1, Node-2), also list down all the credentails in an excel sheet. Done 25/11/2025 11:19 AM
IT Admin and Support Rahul Pradhan Outlook issue: Sorted a user outlook issue that arises due to the newer version of outlook, solved it. done 25/11/2025 10:24 AM
IT Admin and Support Rahul Pradhan Creation of New Mail : Created a new mail for newly joined account executive Sunny and added him in the respective distribution groups. Done 25/11/2025 10:08 AM
employee clearance Abhimanyu singh Enhance ui Done 24/11/2025 11:05 PM
IT Admin and Support Prabhas Singh Vindhyaraj Installed Edrawmax:- for network architecture project Done 24/11/2025 09:35 PM
IT Admin and Support Prabhas Singh Vindhyaraj Graphics dept software beta version issue resolved:- Uninstalled the beta and reinstall standard version Done 24/11/2025 09:30 PM
IT Admin and Support Prabhas Singh Vindhyaraj Boot Windows 10 and Installed Drivers in Worksation Done 24/11/2025 09:29 PM
IT Admin and Support Prabhas Singh Vindhyaraj Assigned Mouse to Kashish (Dev Team), and Updated in Asset Allocated sheet. Done 24/11/2025 09:28 PM
IT Admin and Support Prabhas Singh Vindhyaraj Update user details in Microsoft Entra ID Done 24/11/2025 09:26 PM
IT Admin and Support Prabhas Singh Vindhyaraj Scanner Docs Tilt Scanning Resolved: Clean Feeder Glass and Roller Done 24/11/2025 09:25 PM
HRMS Aniket Today I worked on modification in device upload api and dwr module and worked on testing of backend of DWR project Done 24/11/2025 08:58 PM
HRMS Shreya Today my focus was on the HRMS project, where I developed APIs for the Candidate Application and Job Request functionalities to meet frontend requirements. Done 24/11/2025 08:57 PM
LMS Internal Panel Shreya Today I worked on Lms Internal panel in which I handled several modifications within the internal LMS panel, which included updating the routing controller and implementing new APIs specifically designed for the routing update of Excel data. Done 24/11/2025 08:55 PM
HRMS Mohit kaushal Today I worked on TA module in call order model and candidate journey and made there controllers Done 24/11/2025 08:23 PM
LMS Internal Panel Ayush Fix minor issue in the project and tested it Done 24/11/2025 07:53 PM
HRMS Ayush Discuss about TA and Onboarding module with HR team Done 24/11/2025 07:52 PM
Legal Draft Shivam Kumar Worked on Bank Details module, designed a dynamic structure using BankDetails and BankField models, and discussed flexible vs fixed formats. Created models, added template fields for Template ID 1, and prepared a sample FormSubmission request. Bank Details API structure finalized and initial implementation completed. 24/11/2025 07:52 PM
HRMS Pawanpreet Kaur Today Worked on the Onboarding Module where the preboarding Form is done and also started the Onboarding Phase Done 24/11/2025 07:43 PM
HRMS Clinton Laishram Complete the ui for permission page. Added module enable and disable according to the role and user. And also added to change the permission level for submodule. And find ui for other pages also. Done 24/11/2025 07:19 PM
HRMS Priyanshi Jain Today I made UI changes to the employee dashboard and integrated APIs to display employee details. Also improved the add employee form's UI, fixed errors, and started working on the HR dashboard. In progress 24/11/2025 07:11 PM
HRMS Kashish varshney Worked on Onboarding Module and make Apis for checklist Done 24/11/2025 07:10 PM
HRMS Rashi Garg Today I integrated APIs for shortlisted and rejected candidates in candidate applications, also integrated get referred APIs, and fixed the UI for these sections. And also added an approval field in job posts. Done 24/11/2025 07:10 PM
IT Admin and Support Rahul Pradhan Set up an PC for Seema Done 24/11/2025 07:03 PM
DWR Yash Veer Jain Give Demo to the IT Support Team Done 24/11/2025 06:59 PM
Gate Pass Management Yash Veer Jain Understand the required changes and start working on it which are given by the Hr InProgress 24/11/2025 06:58 PM
HRMS Yash Veer Jain Work on ui changes and api issue Done 24/11/2025 06:57 PM
Gate Pass Management Rahul Yadav worked on gatepass management system where i made APIs for user location and fetch same looction of employee done 24/11/2025 06:57 PM
GatePass (App) Shashank Vyas today i fixed the bugs in employee attendance page .fixed the code to fetch the employee code from server and saved in local database and then show it in the ui . fixed duplicate entries in pending checkout table. update the sync logic for offline functionality in employee attendance and then sync to server. done 24/11/2025 06:56 PM
HRMS Rahul Yadav worked on permission controller and made the necessary API for it done 24/11/2025 06:55 PM
HRMS Anshu Chauhan Today I understand the flow of onboarding module of HRMS project and worked on the preboarding form. Inprogess 24/11/2025 06:53 PM
HRMS Saloni Jain Today i worked on the dwr module nd create a manager reports tab for admin role , integrate with the screen shot api nd did the changes Done 24/11/2025 06:41 PM
Content Calendar Souvik Mazumder Complete the final content calendar and content sections, followed by internal meeting for finalisation Content prepared and shared, meeting held and finalised all sections. Some options were rejected and content was shared accordingly 24/11/2025 06:40 PM
IT Admin and Support Rahul Pradhan Camera CAT6 cable tagging is completed with Deepak’s help. Only two cables on the 5th floor are pending since they haven’t been laid yet; we will tag them once completed. Done 24/11/2025 04:54 PM
IT Admin and Support Rahul Pradhan We have created a centralized sheet where we are documenting each troubleshooting step that we perform on a regular basis. Done 24/11/2025 04:52 PM
IT Admin and Support Rahul Pradhan We have created a Master Database sheet to consolidate all organizational assets into a single place. Our team has started updating it, and the entries are currently in progress. Done 24/11/2025 04:50 PM
IT Admin and Support Rahul Pradhan As per the confirmation by Hitesh sir, i have deleted Urooz mail done 24/11/2025 04:49 PM
IT Admin and Support Deepak Added biometric entry for the new user. Resolved issue where Teams notifications were not showing in Outlook. Checked and diagnosed internet issues on the ground floor. Resolved network issue related to the user’s access point. Assisted with user’s mail password change. Completed LAN camera marking, access point marking, and biometric point marking on the 5th floor. Done 24/11/2025 04:39 PM
IT Admin and Support Prabhas Singh Vindhyaraj Summarise Inventory (Country-Wise): Extract Data from Harware Report Rohit to Out of India Done 24/11/2025 04:11 PM
HRMS Mohit kaushal Today I worked on testing of email service and fixed the bugs of documentation upload Done 22/11/2025 08:44 PM
HRMS Aniket Today I worked on device upload module in which I made api of get screenshot by date and employee id and worked on jwt service and changed dwr service time to 10:30 Done 22/11/2025 08:38 PM
HRMS Shreya Today, my focus was on the HRMS project, where I developed APIs for the Candidate Application and Job Request functionalities to meet frontend requirements. Additionally, I handled several modifications within the internal LMS panel, which included updating the routing controller and implementing new APIs specifically designed for the routing update of Excel data. Done 22/11/2025 08:37 PM
LMS Internal Panel Ayush Today, I tested and fixed the issues that occurred during the development process. In-progress 22/11/2025 08:24 PM
LMS Internal Panel Aditya Today I tested the mail reader service for RN upload and change the functionality of detection route and dubug it properly Completed 22/11/2025 07:47 PM
Legal Draft Shivam Kumar Completed API enhancements by adding two new endpoints in the FormSubmissionController to fetch submissions by ID and by Template ID, along with implementing the required service methods. Updated dependency injection in Program.cs for the new services. Resolved migration issues, added the IsSingleInstance column to the Template model, and successfully applied the migration. Also did minor refactoring and basic testing to ensure all new features are working smoothly. Work completed as planned; minor refactoring tasks will continue in the next update. 22/11/2025 07:33 PM
employee clearance Abhimanyu singh Work on api error Attempted 22/11/2025 07:32 PM
HRMS Pawanpreet Kaur Today, I worked on the Onboarding Module where I worked on the Onboarding Checklist Template and done changes according the flow Done 22/11/2025 07:12 PM
HRMS Clinton Laishram Worked on permission table section. Design the UI and start developing it. Make it user friendly, so that admin can easily toggle on or off to access the modules or submodule along with read, write and delete. on Progress 22/11/2025 07:10 PM
HRMS Kashish varshney Worked on Onboarding models and make Apis for checklistand solve bugs Done 22/11/2025 07:03 PM
HRMS Rashi Garg Today I integrated email API for job requests and created pages for all, referred, shortlisted, and rejected candidates under candidate applications. Also added a dialog for viewing details. Inprogress 22/11/2025 07:03 PM
Mokshu Website Yash Veer Jain Complete all the changes given by the digital marketing team Done and live the changes and also fix the menu issue 22/11/2025 07:02 PM
HRMS Priyanshi Jain Today I created the employee dashboard and improved its UI. I used Shadcn components to add different types of charts, and add animations using framer-motion, making the dashboard interactive. Completed 22/11/2025 07:02 PM
HRMS Yash Veer Jain Integrate the api for the screenshot functionality in dwr module for admin and manager and also fix the ui/ux Inprogress 22/11/2025 07:01 PM
HRMS Saloni Jain today i worked on the Manager section in DWR module and added the functionality of screenshot device and integrated API and fixed some bugs. done 22/11/2025 06:44 PM
GatePass (App) Shashank Vyas Today, I completed the implementation of the SQLite local database and the full data sync logic in the GatePass app. I tested the offline-first workflow and verified data flow between local storage and the server. done 22/11/2025 06:42 PM
Digital marketing panel Anshu Chauhan Today i have fix some bugs in the digital panel. Done some changes in the UI and make the components responsive and fixed the theme as well. done 22/11/2025 06:36 PM
Content Research Souvik Mazumder Additions to December Calendar- And completing the tabs with all needed information Content category aligned with total posts, Questions to be asked to management for year end data added for post creation for December 22/11/2025 06:36 PM
HRMS Rahul Yadav worked on Employee controller updated Api for new field UploadProfile Picture and added new API for Update Employee done 22/11/2025 06:36 PM
Content Calendar Sumeet Kumar Singh Project Alloted Content Calendar - Sumeet Kumar Singh Target For Today Remarks Date & TimeSharing ideas for the 26th Nov thought-leadership post with Pragya NA 22/11/2025 04:25 PM
HRMS Aniket Today I worked on DWR module in which I worked on get api and made APIs of device upload Done 21/11/2025 08:58 PM
LMS Internal Panel Shreya Today, I worked on the APIs for bulk Excel updates based on the ID for routing on the LMS internal panel. Later, I will work on the Company AM mapping controller Done 21/11/2025 08:57 PM
LMS Internal Panel Aditya Today I worked on service to test all the cases and read currency and routes from the excel Completed 21/11/2025 08:08 PM
LMS Internal Panel Ayush Integrated APIs in bulk routing section in procurement and noc section and tested rn rates section. Done 21/11/2025 07:56 PM
HRMS Mohit kaushal Today I worked on email service based on role hierarchy and worked on the candidate documents upload module Done 21/11/2025 07:54 PM
Legal Draft Shivam Kumar Created Template model structure along with the related field model. Implemented Template service with GetByIdAsync and GetAllAsync methods, and added corresponding controller endpoints. Fixed JSON circular reference issues. Template module implementation completed and tested successfully. 21/11/2025 07:44 PM
employee clearance Abhimanyu singh Resolve the 405 error and refine ui Done 21/11/2025 07:31 PM
HRMS Yash Veer Jain Complete all the ui fixes and api integration in dwr panel of the hrms project Done 21/11/2025 07:16 PM
HRMS Clinton Laishram Study about HRMS project documents and structure. Added login functionality and protected routes. Added the functionality to save user details and permission in redux store. Done 21/11/2025 07:09 PM
HRMS Pawanpreet Kaur Today, I focused on the dynamic fields for the Preboarding Form module. I implemented functionality to create, update, and delete dynamic fields, including handling file uploads for each document type. I ensured that existing files are preserved when new files are added, updates are correctly linked to the candidate’s ID, and all operations follow proper validation so that only valid data is updated. Done 21/11/2025 07:09 PM
Digital marketing panel Anshu Chauhan Today i worked on the remark section of the event module, fix some bugs on the same module. done 21/11/2025 07:08 PM
HRMS Rahul Yadav worked on HRMS controller of employee and department identified the mistakes in APIs and resolve the bugs and tested the whole API done 21/11/2025 07:04 PM
HRMS Rashi Garg Today I worked on candidate applications and made some changes to the job request form. In progress 21/11/2025 07:04 PM
HRMS Priyanshi Jain Today I converted the add employee form into a multi-step form, fixed its UI, and added validations to the form. Done 21/11/2025 07:03 PM
employee clearance Rahul Yadav worked on employee clearance APIs modified and tested signature upload done 21/11/2025 07:03 PM
HRMS Kashish varshney solve bugs on User Apis and made changes in Onboarding module and Onboarding Chcecklist apis done 21/11/2025 07:02 PM
Content Research Sumeet Kumar Singh Prepare the content for the month of decemeber. After that prepare the budgeting report for the https://globalkeystoneinfratech.com/ then preparing the MOM for the same. NA 21/11/2025 06:59 PM
HRMS Saloni Jain Today i worked on the dwr section nd fixed some bugs nd integrate some api done 21/11/2025 06:58 PM
GatePass (App) Shashank Vyas Today, I completed the implementation of the SQLite database and sync logic for the Gate Pass app. Core features are working smoothly, though 2–3 attendance-related errors remain, which I plan to fix tomorrow. done 21/11/2025 06:58 PM
HRMS Mohit kaushal Today I worked on job request module in which I made modification and performed joins between two table and updated the controller Done 20/11/2025 08:31 PM
HRMS Aniket Today I worked on testing of screenshot upload in dwr and added modification in project and Dwr module and updated it Done 20/11/2025 08:27 PM
LMS Internal Panel Shreya Today I worked on Routing module in which I worked on upload of excel sheet and updated the fields as in excel sheet Done 20/11/2025 08:26 PM
LMS Internal Panel Aditya Today, I worked on the Lms pannel APis and create endpoints of update RN and delete Rn where in delete RN i delete RN softly also i work on the service IN Progress 20/11/2025 08:19 PM
Legal Draft Shivam Kumar Understood the initial requirements of the new legal document automation project and discussed scope covering variable fields like location, currency, bank details, and governing law. Initial requirement study completed; next steps planned for gathering details and template preparation. 20/11/2025 07:43 PM
employee clearance Abhimanyu singh Work recommended changes in the website Done 20/11/2025 07:34 PM
Billing and invoice (frontend) Clinton Laishram Add entity field in client and invoice table. Fixed user details update error by admin and user itself. Added password change functionality. Done 20/11/2025 07:31 PM
HRMS Priyanshi Jain Today I created an employee table in the HRMS panel, built an add employee form, worked on view, edit, and delete employee details, and fixed the UI. In progress 20/11/2025 07:12 PM
HRMS Rashi Garg Today, I integrated the edit and delete APIs for job posts, and added an "Approved By" field to the job request form with token integration. I also understood the approval workflow.... Done 20/11/2025 07:12 PM
HRMS Yash Veer Jain Work on the dwr Section of HRMS Project Onprogress, Make the Manager Panel Fully Responsive and also fix the ui bugs and integrate the api's to make the dwr working smoothly. 20/11/2025 07:06 PM
LMS Internal Panel Ayush Integrated Edit and Delete features in RN Data and also make the TAT functionality Dynamic and tested routing and testing functionality. Done 20/11/2025 07:06 PM
HRMS Kashish varshney i worked on Onboarding module create onboarding checklist model,candidateChecklist model or solve bugs login apis and others done 20/11/2025 07:06 PM
Legal Draft Yash Veer Jain Attend the meeting and understand the requirement Complete 20/11/2025 07:04 PM
HRMS Pawanpreet Kaur Today I worked on the Onboarding Module where I added some functionality in User Portal login and also implemented the Preboarding Form functionality which is still in progress Done 20/11/2025 06:57 PM
HRMS Saloni Jain Today i worked on the manager page in dwr section nd fixed some bugs of admin page ui done 20/11/2025 06:53 PM
employee clearance Rahul Yadav worked on employee clearance form where remark for gadgets are sends through json file with its serial number and status of returning devices are shown and combine signature api in one post api while submitting the form done 20/11/2025 06:48 PM
GatePass (App) Shashank Vyas Today i made changes on add visitor form added the data sync functionality in the visitor section , add a cleanup functionality also to clean the data older than 7 days of visitors. i will implement this functionality to other sections also . done 20/11/2025 06:48 PM
employee clearance Abhimanyu singh Integrate api Done 19/11/2025 11:37 PM
HRMS Shreya Today I worked on Candidate Application module in which I added new APIs and made some changes in Get and update Api Done 19/11/2025 08:38 PM
HRMS Mohit kaushal Today I worked on interview schedule module in which I made changes in controller and added Evaluation table and made its APIs Done 19/11/2025 08:29 PM
HRMS Aniket Today I worked on DWR module in which I added new api for posting dwr for manager role and made changes in project allotment module Done 19/11/2025 08:12 PM
LMS Internal Panel Aditya Today I worked on LMS Internal pannel i perform join the companyAM-Mapping with Upload-RN Table and show company codes in the response based on the the matching mail Done 19/11/2025 08:01 PM
Digital marketing panel Shivam Kumar Updated and tested all APIs to ensure proper functionality and performance. All endpoints verified and working as expected. 19/11/2025 07:49 PM
HRMS Pawanpreet Kaur Today, I focused on the Onboarding Module, successfully implementing Portal Login and Password Reset functionality. I also completed the necessary CRUD operations for the Feedback Model. Done 19/11/2025 07:22 PM
HRMS Yash Veer Jain Add component for adding new project for the dwr panel done 19/11/2025 07:06 PM
Mokshu Website Yash Veer Jain Work On Images and change all the dummy images from the website to the real images Complete 19/11/2025 07:05 PM
HRMS Kashish varshney Some changes in login api and validate onboarding model Done 19/11/2025 07:03 PM
LMS Internal Panel Ayush Added Bulk routing in procurement and noc routing section, and also added Copy, edit and delete section in rn-upload. Done 19/11/2025 07:01 PM
GatePass (App) Shashank Vyas Planned safe SQLite–server sync logic, designed nightly comparison flow, identified failure cases, start implementing the new flow. done 19/11/2025 07:00 PM
HRMS Saloni Jain Today i worked on the dwr module on manager role and complete the project page nd worked on the myreport of manager And dwr page in progress 19/11/2025 06:59 PM
HRMS Rashi Garg Today I create the UI for the job posting form and integrated APIs for it. I also created a table to display all job posts and integrated APIs for that table. Additionally, I added a job title field to the job request form. Done 19/11/2025 06:58 PM
Digital Marketing Panel Priyanshi Jain Today I divided events into two tabs based on status and made some UI changes in the admin, manager, and user modules. I also tested the entire flow of uploading creatives. Completed 19/11/2025 06:57 PM
Content Research Souvik Mazumder Mokshu- Content changes Drafted and prepared a document for necessary changes 19/11/2025 06:43 PM
employee clearance Rahul Yadav worked on email service to provide data of employee to HR And IT admin to notify them what item will be collected from him/her and tested the API which is working correctly done 19/11/2025 06:40 PM
Social Media Report Sumeet Kumar Singh Preparing images and post copy for the upcoming week. na 19/11/2025 06:21 PM
Digital marketing panel Shivam Kumar Updated Post Variation Approval module, refined approval logic, improved status handling, and ensured smooth integration with existing workflow. Also validated API responses to maintain proper consistency across the module. Changes implemented successfully and tested. 18/11/2025 09:55 PM
HRMS Yash Veer Jain Work on the dwr manager panel Inprogress 18/11/2025 08:50 PM
Mokshu Website Yash Veer Jain Complete the book your table section and footer of the website Complete and also integrate the api for the book your table 18/11/2025 08:48 PM
Mokshu Website Ayush Worked on navbar and menu section in the website and also worked on responsiveness of the website Done 18/11/2025 08:22 PM
HRMS Shreya Today I worked on the LMS internal panel, created the required API's on candidate applications and started working on resume screening. Done 18/11/2025 08:11 PM
HRMS Aniket Today I worked on DWR module in which I added changes in Get and Post api and added Device upload api for adding screenshot of all the user Done 18/11/2025 08:08 PM
HRMS Mohit kaushal Today I worked on interview schedule module in which I added all the APIs of it Done 18/11/2025 08:05 PM
employee clearance Abhimanyu singh Complete ui of employee clearance form Done 18/11/2025 08:01 PM
HRMS Pawanpreet Kaur Today I worked on project module in which I made changes in update and create Api and worked on employee module in which I added role base filtering in Get Api Done 18/11/2025 07:59 PM
LMS Internal Panel Aditya Today I test the RN reader mail and checks bugs in iis also refactor the code . Done 18/11/2025 07:58 PM
Mokshu Website Clinton Laishram Create hero section and color theme for the Mokshu website. Add make the component responsiveness also. Done 18/11/2025 07:36 PM
HRMS Kashish varshney Add Address Model and update employee apis or employee model done 18/11/2025 07:10 PM
HRMS Rashi Garg Today I worked on the About section page and table booking section of the Mokshu restaurant website, and made both sections responsive. Also understood the approval workflow in the HRMS panel. Completed 18/11/2025 07:08 PM
Digital Marketing Panel Priyanshi Jain Today I added an approve post button for admins that enables/disables based on conditions, and added a checkbox to approve specific variations and same for manager module. Also gave users a view for final approved posts and fixed an issue with updating media in the multi‑step form. Completed 18/11/2025 07:07 PM
Mokshu Website Anshu Chauhan Today i worked on the Testimonials and Event Gallery section of mokshu website done 18/11/2025 07:03 PM
HRMS Saloni Jain Today i worked on the dwr section in hrms panel, where i complete user secton dwr report done 18/11/2025 07:02 PM
GatePass (App) Shashank Vyas Today, I improved the Gatepass app by fixing the visitor list to show only current visitors, updated image and crop modals for better usability, resolved time fetching issues, formatted UI time in hours and minutes, fixed pending checkout data removal, and enhanced login page styling. done 18/11/2025 06:52 PM
Content Research Souvik Mazumder Content for Linkedin as per changes Set in details based on the new changes and finalised calendar 18/11/2025 06:52 PM
employee clearance Rahul Yadav worked on access control and remark by HR and ITAdmin ,while if the employee living company also migrated the new field done 18/11/2025 06:34 PM
Digital marketing panel Aditya Today I completed the exe of office monitoring web can and screenshot Done 17/11/2025 09:57 PM
Mokshu Website Yash Veer Jain Research content and ui for the website Inprogress 17/11/2025 08:23 PM
HRMS Yash Veer Jain Work on the api integration for the module dwr In progress 17/11/2025 08:18 PM
LMS Internal Panel Ayush Added bulk routing section in procurement section and tested bulk routing section in AM section and added download and upload after updating in the Excel sheet. In-progress 17/11/2025 08:09 PM
HRMS Mohit kaushal Today I worked on Email module in which I fixed all the things as per hierarchy of email service Done 17/11/2025 08:02 PM
Digital marketing panel Shivam Kumar Implemented role-wise remark filtering by updating visibility logic based on SentTo and user roles. Fixed errors in GetRemarksAsync, including the null reference issue from user?.Role, and delivered the fully updated and safe-handled method. Functionality corrected, tested, and working as expected. 17/11/2025 08:01 PM
HRMS Shreya Today, I worked on the LMS internal panel, focusing on the routing module, and I also worked on the HRMS project, specifically on the Candidate Application module. Done 17/11/2025 07:59 PM
HRMS Pawanpreet Kaur Today I worked on project module in which I updated create project and get project APIs as per role and added get api as per department in employee module Done 17/11/2025 07:55 PM
HRMS Aniket Today I worked on project allotment module in which I added new APIs and and fixed the allotment and changed upload documentation api as per the project field Done 17/11/2025 07:53 PM
Billing and invoice (frontend) Clinton Laishram Tested and fixed all bugs and issues of billing and invoices panel. Released the new version of billing and invoices panel to the live server. All Done 17/11/2025 07:49 PM
Digital marketing panel Abhimanyu singh Some edits in dashboard Done 17/11/2025 07:33 PM
Digital Marketing Panel Priyanshi Jain Today, I fixed the remarks section for manager, admin, and user, and I'm currently working on resolving issues in the multi-step form.... In Progress 17/11/2025 07:10 PM
HRMS Rashi Garg Today, I completed the job request form, integrating the API and fine-tuning the UI. I also integrated the API for the job request table, which will be visible to HR, and added a "View Details" action that opens a dialog with more information. Additionally, I've been searching for design inspirations for a restaurant website. Done 17/11/2025 07:05 PM
HRMS Kashish varshney completed the necessary operations on User model and solve bugs in some apis done 17/11/2025 07:03 PM
Digital marketing panel Anshu Chauhan worked on the All Event section for manager and admin role, fix some bugs related to the same and change the UI from the previous one. Inprogess 17/11/2025 06:59 PM
HRMS Saloni Jain Today i worked on the user section of dwr, & integrate it with the api in progress 17/11/2025 06:59 PM
Content Research Souvik Mazumder Content for linkedin from 17Nov-21 NOv Shared content and also posted daily post on LinkedIn 17/11/2025 06:57 PM
GatePass (App) Shashank Vyas Today I implemented the new SQLite flow in Employee Attendance and Pending Checkout, fixed duplicate data issues, updated local DB functions, done 17/11/2025 06:56 PM
ID Card Design Mohit Kumar working na 17/11/2025 06:47 PM
Social Media Report Sumeet Kumar Singh Prepare LinkedIn Analytics PPT Break down the key data points. Visualize key metrics (engagement, impressions, followers, etc.). Analyze Rough LinkedIn Analytics Data Clean up and organize raw data. Identify trends and insights. LMS Advantage Content Incorporate the provided content into the presentation. Done 17/11/2025 06:33 PM
employee clearance Rahul Yadav migrated models after changes and validation updated APIs to fetch the employee exit request done 17/11/2025 06:32 PM
HRMS Rahul Yadav today i worked on APIs to upload Profile Picture through user controller and Search Employee by there Department, Code, status and name done 17/11/2025 06:30 PM
Digital marketing panel Shivam Kumar Completed the Dashboard module with full API setup, including pending/published counts and month-wise filters. Implemented role-based remark fetching using JWT claims with proper access logic for User, Manager, Admin, and SuperAdmin. All functionalities implemented and fully tested. 14/11/2025 09:22 PM
HRMS Aniket Today I worked on DWR module in which I worked on project allotment in which I added new role as according to DwrRole table Done 14/11/2025 08:40 PM
HRMS Shreya Today, I worked on the HRMS project. I worked on the Job Posting and Candidate Application modules. I performed full CRUD operations on the controllers of both modules. Done 14/11/2025 08:38 PM
HRMS Mohit kaushal Today I worked on TA module in which I added new module and added email service in TA module Done 14/11/2025 08:38 PM
HRMS Pawanpreet Kaur Today, I successfully completed the project creation module and also finished implementing the date-wise report filtering module. Both features are now fully functional. Done 14/11/2025 08:32 PM
Digital Marketing Panel Pawanpreet Kaur Today, I worked on multiple Dashboard APIs, including date-wise filters, manager/admin-wise approval summaries, posting-done counts, and created-posts summary. I also fixed logic issues and ensured all APIs return accurate and optimized dashboard data. Done 14/11/2025 08:23 PM
LMS Internal Panel Ayush Added bulk routing section for ams and for procurement where procurement's can download and suggest or pass the routing in Excel or in datatable. In-progress 14/11/2025 07:53 PM
Digital marketing panel Ayush Tested the frontend and suggested necessary changes Done 14/11/2025 07:52 PM
Digital marketing panel Aditya Today I worked on installer of web cam and screenshot detector Done 14/11/2025 07:43 PM
Digital marketing panel Abhimanyu singh Improve admin and manager dashboard Done 14/11/2025 07:34 PM
Billing and invoice (frontend) Clinton Laishram Added sending of transaction table through email. Added user management page also. Testing for the minor bug. Done - email sending & user management. On Progress - Needed to fix filtering issue. 14/11/2025 07:14 PM
GatePass (App) Shashank Vyas today i add the new SQLite flow working on Add Visitor and Visitor List pages. Fixed a bunch of bugs around syncing, form submit, and offline mode. done 14/11/2025 06:58 PM
Content Research Souvik Mazumder Week 3 Content and Documents preparation for LinkedIn Content shared, researched for new content as per previous remarks and submitted documents(branding) as per further posting and marketing requirements 14/11/2025 06:53 PM
Digital marketing panel Anshu Chauhan Today i worked on the All event section of the Manager role created UI and integrated api. Fix some in the Calender section of the user and integrated apis ni the dashboard section. done. 14/11/2025 06:50 PM
HRMS Saloni Jain Today i worked on the ui of the dwr And user dwr section is almost completed Processing 14/11/2025 06:50 PM
LinkedIn Banner Mohit Kumar done done 14/11/2025 06:36 PM
Social Media Report Sumeet Kumar Singh Prepare LinkedIn Analytics PPT Break down the key data points. Visualize key metrics (engagement, impressions, followers, etc.). Analyze Rough LinkedIn Analytics Data Clean up and organize raw data. Identify trends and insights. LMS Advantage Content Incorporate the provided content for the linkedlin post. 50% of work will focus on analyzing LinkedIn analytics data and adding the data in linkedlin. 14/11/2025 06:32 PM
HRMS Rahul Yadav worked User and Employee controller to store the employee id into user table while creating the user from employee table to show employee code in it,also modified the upload document api where user able to upload multiple document in bulk with there path also tested the employee APIs for correct Output done 14/11/2025 06:29 PM
Digital Marketing Panel Priyanshi Jain Today I worked on the remarks section for both manager and user modules, enabling managers and users to add/view remarks. Also in the manager module, add a view section for posts, so managers can see post details. Done 14/11/2025 05:28 PM
HRMS Kashish varshney Some changes in user controller and update some models and test user apis Done 14/11/2025 05:25 PM
HRMS Rashi Garg Today I change and enhance the ui of the job request form and also integrate the api in it Done 14/11/2025 05:20 PM
Digital Marketing Panel Pawanpreet Kaur Developed APIs to handle data and functionality for the Admin Panel Dashboard Done 13/11/2025 08:55 PM
HRMS Pawanpreet Kaur Today worked on the DWR module in HRMS in Project Creation. Done some changes in the Apis Done 13/11/2025 08:51 PM
Digital marketing panel Aditya Today I worked on Web cam detector and screenshot detector also I create a installer of registration of service Done 13/11/2025 08:51 PM
HRMS Aniket Today I worked on project Allotment module in which I made the model and added controller of it with all the funcnality added with employee Done 13/11/2025 08:35 PM
LMS Internal Panel Shreya Today, I worked on the LMS internal panel. I have completed all the modifications and fixed all the bugs that were reported. I have also tested everything thoroughly. Done 13/11/2025 08:34 PM
HRMS Mohit kaushal Today I worked on TA module in which I worked on department and job request controller and made model of department Done 13/11/2025 08:31 PM
Digital marketing panel Shivam Kumar Developed an API in PostApprovalVariationService to toggle the Applied status with user tracking and JWT integration. Implemented GetContentsCountByMonthAsync method to count and return total posts by month. Both functionalities implemented and tested successfully. 13/11/2025 07:56 PM
Digital marketing panel Abhimanyu singh Manager and admin dashboard Done 13/11/2025 07:31 PM
Digital marketing panel Ayush Discussed creative upload section and send for approval flow - 13/11/2025 07:20 PM
Billing and invoice (frontend) Clinton Laishram Added all billing record page for both client and vendor. Added date filter according to billing data, added sorting of table for every column. Added the functionality to upload bulk invoice through excel and pdf. Done 13/11/2025 07:18 PM
LMS Website Ayush Added button in horizontal scrolling section and modified chat bot. Completed 13/11/2025 07:17 PM
HRMS Kashish varshney i worked on User Controller and changes in APis or models done 13/11/2025 07:08 PM
Digital Marketing Panel Priyanshi Jain Today I built a multi‑step dialog for “upload creatives” and “upload post copy,” which lets users create, edit, and view posts through a step‑by‑step flow. Completed 13/11/2025 07:07 PM
HRMS Rashi Garg Today I built a *job request form* for employees to raise job-related requests, created an *HR table* that displays those requests, and also built a *create-post form* for posting job openings in the Talent Acquisition module. Inprogress 13/11/2025 07:07 PM
HRMS Yash Veer Jain Discuss and integrate the api's for the dwr module Role discussion pending. Explain the perspective and discuss the dwr. 13/11/2025 07:04 PM
Social Media Report Souvik Mazumder NA NA 13/11/2025 07:02 PM
GatePass (App) Shashank Vyas Today i change the flow of sqlite in the app syncing whole data once in a day and start changing the flow in the app added the flow in add visitor form today . done 13/11/2025 07:01 PM
HRMS Saloni Jain Today i worked on the dwr section in HRMS panel processing 13/11/2025 06:32 PM
Digital marketing panel Anshu Chauhan Today i fixed the bugs in calender module of user and created the UI of dashboard. done. 13/11/2025 06:26 PM
HRMS Rahul Yadav worked on Document Upload APIs to upload employee document in Employee Controller With file type and And remarks with status done 13/11/2025 06:26 PM
HRMS Pawanpreet Kaur Today I worked on documentation of DWR module in HRMS panel and made project model and performed the CRUD on it In progress 12/11/2025 08:39 PM
HRMS Mohit kaushal Today I worked on TA module in which made the models and started working on it In progress 12/11/2025 08:38 PM
HRMS Yash Veer Jain Understand the dwr flow and work on the ui Integrate and implement the dialogue of add new report at the user page.tomorrow will work on the admin and manager page of dwr module 12/11/2025 08:37 PM
LMS Internal Panel Shreya Today, I worked on the routing controller in the LMS internal panel. worked on both routing and AM suggested routing. I also worked on attaching images to emails. Additionally, I added a new table for TAT and implemented CRUD operations for it. Done 12/11/2025 08:36 PM
HRMS Aniket Today I worked on documentation of DWR panel in HRMS project and started working on project allotment model Documentation done and project allotment is in progress 12/11/2025 08:34 PM
Digital marketing panel Aditya Today I worked on service of camera and screenshot detector and create table of store device information and screenshot Done 12/11/2025 08:21 PM
Digital marketing panel Shivam Kumar Worked on defining and implementing HR-side functionalities and access controls for the Birthday Post module. HR access and permissions configured; functionality development in progress. 12/11/2025 07:53 PM
LMS Website Ayush Added buttons to scroll product section and also modify the career section according to the requirements. Completed 12/11/2025 07:47 PM
HRMS Ayush Validated ta module and dwr module table schema Done 12/11/2025 07:46 PM
Digital marketing panel Abhimanyu singh Manager panel Done 12/11/2025 07:31 PM
HRMS Rashi Garg I've completed the RCS panel. Moving forward, I've begun working on the Talent Acquisition module within the HRMS panel. In this module I started working on Job Request form. In progress 12/11/2025 07:04 PM
Digital Marketing Panel Priyanshi Jain Today I understood the digital marketing panel workflow and added a calendar dropdown in the upload creatives table to select month and year. Also added a variations option in upload creatives and upload post copy dialogs, and changes in ui. Completed 12/11/2025 07:02 PM
HRMS Kashish varshney Add Permission Model and perform necessary operations for User done 12/11/2025 07:01 PM
Social Media Report Souvik Mazumder Prepare Presentation for the report Initial PPT created, needs editing before presenting the same. 12/11/2025 06:54 PM
GatePass (App) Shashank Vyas Today, I implemented SQLite integration in the Employee Attendance and Pending Checkout pages. I worked on syncing attendance data between the server and local database. Encountered some database errors related to prepareAsync, which I’m currently troubleshooting to ensure stable offline functionality and smooth data synchronization in the app. done 12/11/2025 06:52 PM
Digital marketing panel Anshu Chauhan Today i worked on the buld approval section of the manager and admin role. fix the bugs of admin panel and refine its UI. done. 12/11/2025 06:48 PM
HRMS Saloni Jain Today i worked on the dwr section and create a create project form and new project allotment form done 12/11/2025 06:47 PM
HRMS Rahul Yadav Worked on employee controller and services made new model for employees documents Done 12/11/2025 06:36 PM
Social Media Report Sumeet Kumar Singh Research LinkedIn Analytics data on the basis of top-performing posts, focusing on impressions, reach, and engagement rate. Create a rough data sheet in Excel based on the analysis of the top-performing posts. Cross-check the data from LinkedIn Analytics to ensure its accuracy. Finalize and complete the LinkedIn Analytics report with verified data. Preparing to finalize the presentation after reviewing all data for clarity and completeness. 12/11/2025 06:28 PM
LMS Internal Panel Shreya I worked on the LMS internal panel, focusing on routing and the RN Upload module. On the routing controller, I implemented and tested bulk routing through Excel upload. In the RN Uploads module, I worked on the API for fetching currency and vendor rates, and tested its functionality. Done 11/11/2025 08:27 PM
HRMS Pawanpreet Kaur Today, I worked on implementing the DWR module in the HRMS remake version, which is currently in progress. I also worked on the Project and Department allocation feature to assign employees to their respective projects and departments. In progress 11/11/2025 08:24 PM
DWR Aniket Today I worked on DWR service testing and fixed bug of project allotment Done 11/11/2025 08:06 PM
HRMS Mohit kaushal Today I made onboarding module models in HRMS project and send for validation Done 11/11/2025 08:04 PM
Billing and invoice (frontend) Clinton Laishram Adding functionality to multiple invoices. Successfully added the functionality to add multiple invoices at a time for both client and vendor. Fix the issue of table refresh after the data is added. And also added the due list page for both client and vendor. 11/11/2025 07:25 PM
RCS Panel Priyanshi Jain Today, I added media file support in archived campaigns and introduced a search-by-name dropdown in the campaign tables for admin, reseller and user modules. Completed 11/11/2025 07:22 PM
RCS Panel Kashish varshney I made changes in Campaign APis or archive campaign Done 11/11/2025 07:20 PM
HRMS Kashish varshney I made Models of Role table and sub module table and add login api in user controller Done 11/11/2025 07:17 PM
RCS Panel Rashi Garg Today , I worked in the admin campaign table , in which I replace the user ID by their respective names and also update the search functionality accordingly. Completed 11/11/2025 07:14 PM
LMS Website Admin Panel Ayush Fix the bug of protected route in the admin panel Done 11/11/2025 07:12 PM
HRMS Ayush Modify the panel according to the suggested changes Done 11/11/2025 07:11 PM
LMS Website Ayush Remove horizontal scrolling form the panel to normal x scrolling Done 11/11/2025 07:08 PM
Digital marketing panel Shivam Kumar Implemented and tested BirthdayPostService module with create, upload, update, and filter functionalities. Added Templates Model and Controller for managing post templates. Modules integrated successfully And Tested 11/11/2025 07:04 PM
LMS Website Yash Veer Jain Give demo to hr team of the hr panel of lms website Done 11/11/2025 07:02 PM
Digital marketing panel Aditya Today I worked implementation of some Apis in birthdaypost module also created table of birthdaypostmedia and upload multiple media and create a filter endpoint for better search Done 11/11/2025 07:02 PM
GatePass (App) Shashank Vyas Today, I implemented SQLite in the Add Visitor and Visitor List pages to enable offline data storage and retrieval. I ensured smooth functionality for adding, viewing, and syncing visitors when online. Additionally, I fixed minor bugs, tested local and server data consistency, and optimized performance across these pages. done 11/11/2025 07:01 PM
HRMS Yash Veer Jain Work on dwr in hrms Made a page of the employee to add and view the dwr including table and structure. Also work on the app-siderbar 11/11/2025 06:59 PM
ID Card Design Mohit Kumar done na 11/11/2025 06:57 PM
LinkedIn Banner Mohit Kumar done done 11/11/2025 06:53 PM
Social Media Report Sumeet Kumar Singh Extract LinkedIn Analytics Report data for the months of April to October, Research LinkedIn Analytics data on the basis of top-performing posts, focusing on impressions, reach, and engagement rate, Create a rough data sheet in Excel based on the analysis of the top-performing posts. Data extraction and analysis on LinkedIn for the months April to October has been completed. Identified key posts that performed best in terms of impressions, reach, and engagement rate. Compiled rough data into an Excel file for further analysis and reference. Need to continue refining data and insights from the Excel sheet for final reporting. 11/11/2025 06:39 PM
HRMS Rahul Yadav Worked on Employee Controller to Create new Employee and get the all data of employee in bulk also by Id,added API for update details of employee,Worked Document module and models done 11/11/2025 06:38 PM
HRMS Saloni Jain Today i worked on the dwr section in hrms panel, where i create two file add report nd proejct allotment Done 11/11/2025 06:37 PM
Social Media Report Souvik Mazumder Linkedin Detailed Analytics for Best performing posts Prepared a document after coordination with Sumeet, as discussed in the meeting 11/11/2025 06:36 PM
Digital marketing panel Anshu Chauhan Today I worked on the upload creative, notification section of the user role and fix some change on the LMS website Done. 11/11/2025 05:08 PM
LMS Internal Panel Shreya I worked on the routing controller in the LMS internal panel. A new model for bulk routing was added, and the routing table was updated. I also created an API for this and worked on the upload controller. Done 10/11/2025 08:19 PM
HRMS Mohit kaushal Today, I reviewed the documentation overview of the HRMS project and examined the model schemas in detail. The documentation provided a clear understanding of the system’s overall structure, functionalities, and workflow. Done 10/11/2025 08:16 PM
DWR Aniket Today I worked on DWR service in which I fixed all the bugs and added fields of HRMS employee table in Dwr employee table Done 10/11/2025 08:11 PM
Digital marketing panel Aditya Todays I worked on add column curreny and modify the service and controller Done 10/11/2025 08:08 PM
Digital marketing panel Aditya Today I worked on Created Apis of post copy and also created endpoint to fetch data based on cid Done 10/11/2025 08:07 PM
RCS Panel Priyanshi Jain Today, I fixed the media file preview issue and made necessary UI adjustments. Completed 10/11/2025 07:30 PM
RCS Panel Rashi Garg Today, I fixed some bugs in the status update feature as it wasn’t displaying correctly. All good now! Completed 10/11/2025 07:27 PM
RCS Panel Kashish varshney Add Archieve Campaign File Model and change in Archieve Campaign APis done 10/11/2025 07:21 PM
LMS Internal Panel Ayush Added Bulk Routing page for AM's so that am's can upload excel in the frondend Done 10/11/2025 07:21 PM
HRMS Ayush Worked on making the template for the project added user's module permission feature and dynamic component rendering. Working in Progress 10/11/2025 07:20 PM
Billing and invoice (frontend) Clinton Laishram Adding invoice tab for both client and vendor. Successfully added the tab for invoices for both client and vendor. here user can add invoices also. Added the filtering functionality according to the selected date or financial year for both client and vendor invoices. 10/11/2025 07:12 PM
Digital Marketing Panel Pawanpreet Kaur I made updates in the Content Calendar module. The Category is now handled directly as a text value, so the separate Category table is no longer required. I also updated the date filtering API to correctly return content based on the selected year, month, and day, ensuring the data matches the required behavior. Done 10/11/2025 07:11 PM
Digital marketing panel Shivam Kumar Add BirthdayPost Model ,Controller and Functionality Model and Controller added; development of remaining functionalities and APIs is in progress. 10/11/2025 07:05 PM
GatePass (App) Shashank Vyas Today, I worked on implementing SQLite in the employee attendance and related pages. Due to multiple errors during integration, we had to reset the project to the last Gitea commit. My recent uncommitted SQLite changes (on 2–3 pages) were lost, so I started re-implementing the SQLite integration again from scratch. pending 10/11/2025 06:59 PM
Digital Marketing Panel Yash Veer Jain Add category section in the guard section complete 10/11/2025 06:58 PM
Gate Pass Management Yash Veer Jain Check the checkout bug for the guard panel Inprogress 10/11/2025 06:57 PM
HRMS Yash Veer Jain Discuss the flow of the project and user login schema for the hrms panel InProgress 10/11/2025 06:53 PM
HRMS Saloni Jain Today i understand the documentations of HRMS, & research about the frontend part of the panel done 10/11/2025 06:52 PM
Digital marketing panel Anshu Chauhan Today I worked on the upload creative and post cody section of the user and created the ui for birthday module. Done 10/11/2025 06:47 PM
HRMS Rahul Yadav started working on HRMS used JWT service for user login and making model for Users and build controller for it in progress 10/11/2025 06:45 PM
Social Media Report Souvik Mazumder Generate report and analyze the demographics and the locations the posts are reaching out Report generated, shared and analyzed various factors which are required for impressions and engagement for the company page. 10/11/2025 06:37 PM
Digital Marketing Panel Pawanpreet Kaur Today, I created the Category table along with its related APIs and mapped the CategoryId field to the ContentCalendar table. This mapping allows each piece of content to be associated with a specific category. With this setup, I can now retrieve category-wise content counts for a selected month and year. The API will show how many contents were created under each category during that period, as well as the total number of contents created in that month. Done 08/11/2025 09:11 PM
LMS Internal Panel Shreya Today, I worked on the LMS internal panel. Yesterday, we made the API live, and after that, some bugs appeared Like mails were not being sent to the AM while creating routing .I fixed that. I also added some new functionalities — like populating the vendor rate as requested. Work is still ongoing on the routing bulk upload from Excel feature. Done 08/11/2025 08:56 PM
employee clearance Aniket Today I worked on exit form module in which I added new api for view and download the signature and added three more fields and updated the controller Done 08/11/2025 08:54 PM
DWR Aniket Today I worked on DWR service in which I made changes as added indexing in table and admin will be send diffrent mail of different departments and in body added total employee and present report Done 08/11/2025 08:50 PM
Digital marketing panel Aditya Today I worked changing the response of approval Apis and created apis of fetch post details and content details based on the content id and also created structure of employees table Done 08/11/2025 08:11 PM
RCS Panel Rashi Garg Today, I updated the status for specific number in the update status section and updated the corresponding count. I also added authorization for update status in the reseller module and reviewed the panel.... Completed 08/11/2025 07:52 PM
RCS Panel Priyanshi Jain Today, I integrated a text editor in the campaign content section and added media file visibility in the campaign tables across reseller, user, and admin modules. I also included options for file preview and download. Completed 08/11/2025 07:50 PM
RCS Panel Kashish varshney I worked on Campaign controller and change some APis for upload media files Done 08/11/2025 07:45 PM
Billing and invoice (frontend) Clinton Laishram Transfer the code and functionality from old panel to new design panel. Successfully added the SOA, company and invoices added pages to new design panel. Added the sorting and filter to the table also as per requested. 08/11/2025 07:29 PM
LMS Internal Panel Ayush Fixed the bug in the routing section where AMs were unable to click on the dropdown. Added a timer feature in the On Hold section of the admin panel and in the procurement routing section. Additionally, tested the procurement pass issue where the procurement pass was incorrectly moving to On Hold. Completed 08/11/2025 07:26 PM
GatePass (App) Shashank Vyas Today, I worked on the employee attendance module in gatepass app. I created SQLite tables for employees and attendance and attempted to add missing columns and joins. Some parts of the attendance table setup and data retrieval are still incomplete and require further implementation. pending 08/11/2025 07:18 PM
Digital marketing panel Shivam Kumar Added Employee Model and Controller, and developed all related APIs including Excel Upload functionality. Completed . 08/11/2025 06:50 PM
Digital marketing panel Anshu Chauhan Today I worked on calendar module of the digital panel. Worked on the notification section and did changes on the LMS website. Done. 08/11/2025 06:47 PM
LMS Website Admin Panel Saloni Jain today i worked on the exit clearance and onboarding section in admin panel , in exit clearance worked on the edit section and integrated it with the put api and in onboarding panel add some functionalities like export into excel and same integrate it with the put api. done 08/11/2025 06:43 PM
Social Media Report Souvik Mazumder No tasks for today as was involved in the research, discussiond and preparation of Novemeber Calendar NA 08/11/2025 06:29 PM
Gate Pass Management Yash Veer Jain Working on the admin panel and resolve the date issue for pending check out in security panel and also resolve the otp verification issue, and the also resolve ui/ux bugs and test the application. All things completed and also start working on the Digital panel 08/11/2025 06:26 PM
RCS Panel Rahul Yadav i worked on Campaign controller and update some APIs where i modified the field to fetch the file type data and its property done 08/11/2025 06:07 PM
DWR Aniket Today I worked on UI of forget password and tested it and made UI of logout as all the user information will be there when user is logged in and fixed the navbar Done 07/11/2025 09:04 PM
Digital Marketing Panel Pawanpreet Kaur Today, I updated the Remarks API with proper role-based access so Admin, Manager, and User can only view and respond to remarks relevant to them, and restricted Managers from sending new remarks to Admin. Done 07/11/2025 08:58 PM
LMS Internal Panel Shreya Today I worked on internal panel on Routing module in which I made some modifications and updated the code In progress 07/11/2025 08:57 PM
Digital marketing panel Shivam Kumar Tested all APIs and verified the working of Notification and Email Service. All APIs and services tested successfully, working as expected. 07/11/2025 08:48 PM
RCS Panel Rashi Garg Today, I added search functionality to the "Update Status" section and ensured the delivered & rejected counts update dynamically based on the status changes. Inprogress 07/11/2025 08:42 PM
RCS Panel Priyanshi Jain Today, I added validations for create, change, and reset password . Also, integrated a media upload option in campaign content. Done 07/11/2025 08:41 PM
Digital marketing panel Aditya Today I Worked on test the all Apis and created on filter endpoint based on the year , month and day . Done 07/11/2025 08:22 PM
GatePass (App) Shashank Vyas Today i work on the add visitor and visitor list .fixing the error while showing data from sqlite and from server to the visitor-list form done 07/11/2025 07:04 PM
Gate Pass Management Yash Veer Jain Work on the admin panel of the gatepass management system Works on the responsiveness of the panel and make the dashboard of the admin panel. Also resolve the otp verification issue for the login of hr and admin 07/11/2025 07:03 PM
LMS Website Admin Panel Saloni Jain today i worked on the admil panel of lms website where i create two more section employee onboarding details nd exit clearance details of employee processing 07/11/2025 06:59 PM
Digital marketing panel Anshu Chauhan Today i worked on the create calender module, fix the bugs in remarks section , created ui for remarks and refine it. done. 07/11/2025 06:59 PM
DWR Aniket Today I worked UI or project and changed User settings of manager to see their own department employee and added forget password while login Done 06/11/2025 09:06 PM
Campaign Mohit kaushal Today I worked on campaign in which I added credit table and added that when message will be credit will be deducted In progress 06/11/2025 09:05 PM
LMS Internal Panel Shreya Today I worked on Routing module in which I worked on image Attachment in email while multiple routing In progress 06/11/2025 09:04 PM
RCS Panel Rashi Garg Today, I displayed the wallet balance in the header, fixed the sidebar functionality on small screens and default screens, modified notifications to include audio, and adjusted the table UI to align with the sidebar.... Completed 06/11/2025 08:49 PM
RCS Panel Priyanshi Jain Today, I implemented notification routing for admins and users, made the necessary adjustments, and performed thorough testing of the RCS panel to ensure everything is working as expected. Completed 06/11/2025 08:47 PM
Digital Marketing Panel Pawanpreet Kaur Today, I worked on the Remarks module. I added some new fields and updated the existing APIs as per the requirements. I also performed testing for email functionality and notification APIs to ensure everything is working correctly. Done 06/11/2025 08:36 PM
Gate Pass Management Yash Veer Jain Resolve the ui bugs and live the latest changes Complete 06/11/2025 08:33 PM
LMS Internal Panel Ayush Tested and fix ui issues of patch update module Done 06/11/2025 08:33 PM
HRMS Documentation Work Kashish varshney Validate Attendance and Leave module Done 06/11/2025 07:10 PM
RCS Panel Rahul Yadav I worked on campaign controller where i modified the generate the campaign api by id done 06/11/2025 07:04 PM
employee clearance Saloni Jain Today i worked on signature section in acknowledge section , also update the ui of the layout done 06/11/2025 07:02 PM
Digital marketing panel Anshu Chauhan today i worked on the calender module of admin panel and worked on the notification section and fix some bugs in the remarks section. done. 06/11/2025 07:01 PM
GatePass (App) Shashank Vyas Today, I worked on the Add Visitor functionality, ensuring offline support by storing visitor data locally when the server or internet is unavailable. Implemented local saving, automatic syncing, and error handling. Also tested signature capture, image uploads, and server API integration using SQLite. done 06/11/2025 07:01 PM
RCS Panel Priyanshi Jain Today, I added notification routing in the reseller module, fixed the custom page size glitch, and fixed some minor issues. Done 05/11/2025 09:17 PM
RCS Panel Rashi Garg Today, I change the dashboards’ UI for a cleaner look, fixed the search functionality in recharge and transaction tables, and resolved a bug in the campaign table. I also integrated "Reset Password" in the account section and also modified the Edit Profile feature. Completed 05/11/2025 09:17 PM
LMS Internal Panel Ayush Tested emails and fixed the bugs that occurred during the panel testing. Implemented new APIs for routing, AMSuggestedRouting, CreateMultipleRouting, and CreateMultiAMSuggestedRouting. Done 05/11/2025 09:08 PM
employee clearance Mohit kaushal Today I made some changes in employee clearance form and updated the code accordingly Done 05/11/2025 08:35 PM
LMS Internal Panel Shreya Today I worked on internal panel on Routing module in which I made some modifications and updated the code and updated the External Ticket and Ticket Module In Progress 05/11/2025 08:32 PM
Digital marketing panel Shivam Kumar Worked on MonthApprovePost Service and added Email & Notification Service. Development completed. Testing and validation in progress. 05/11/2025 08:30 PM
DWR Aniket Today I worked on project allotment in which I changed completion date to hold past date and changed logo of Lms and added check for multiple departments and added on forget password for change password on the base of email All done forget password is in progress 05/11/2025 08:28 PM
Digital Marketing Panel Pawanpreet Kaur Made necessary API updates in the Content Calendar, Remarks, and Notification modules as per the latest requirements. Done 05/11/2025 08:20 PM
Digital marketing panel Aditya Today I worked on. Test all the emails and notification post approval Apis is completed. Done 05/11/2025 08:17 PM
HRMS Documentation Work Kashish varshney I made changes in Schema of exit and payroll module Done 05/11/2025 07:18 PM
Gate Pass Management Yash Veer Jain Live the latest changes of the project and give demo to the Hr team and security guard Complete 05/11/2025 06:54 PM
RCS Panel Rahul Yadav worked on RCS pannel tested controllers and its APIs for the correct ouput and modified the api done 05/11/2025 06:54 PM
Gate Pass Management Yash Veer Jain Fix the Ui issue in the Hr dashboard panel & user Panel of gate pass management system complete and work on the responsiveness of all the pages including deparment page, employees page ,attendence Page and also minor ui fixes 05/11/2025 06:53 PM
Digital marketing panel Anshu Chauhan Today, I worked on the Manager Calendar and Remarks module. I integrated event fetching from the ContentCalender API and mapped events to their respective dates.The Overview tab displays all event information including title, headline, description, theme, category, status, and date, while the Details tab shows the event description. Fix the bugs and refine the UI of remarks section. done 05/11/2025 06:52 PM
employee clearance Saloni Jain Today i integrate exit form with api nd add remark section in every field. done 05/11/2025 06:52 PM
GatePass (App) Shashank Vyas Today, I made the logic to check both server connectivity and internet connectivity, and implemented switching between the actual server and the local SQLite database accordingly. I also tested the /api/Ping integration, improved offline detection, and set up alerts for connectivity changes to ensure smooth offline functionality in the Gatepass app. done 05/11/2025 06:52 PM
Digital marketing panel Shivam Kumar Added Step by step Approve Remarks service and controller. Completed 04/11/2025 11:55 PM
employee clearance Saloni Jain Today i worked on the ui of exit form Done 04/11/2025 09:05 PM
Digital marketing panel Aditya Today ,I worked on remaining Apis of fetch content by userid and adjust join on four tables and fetch data , Also created role based api and tested remarks section Done 04/11/2025 08:49 PM
employee clearance Mohit kaushal Today I created module of employee clearance in which I added all the necessary field related to the form and made there controller In progress 04/11/2025 08:35 PM
LMS Internal Panel Shreya Today I worked on Routing module in which I worked on attachment of image with email and made some modifications in Testing module and external Ticket module Ticket module and external Ticket module is completed and Routing module is in progress 04/11/2025 08:30 PM
Campaign Aniket Today I worked on user module in which I made modification in UI of add user and display User Done 04/11/2025 08:28 PM
RCS Panel Priyanshi Jain Today, I worked on refining the campaign sections for both admin and reseller modules. For admins, applied filtered to show campaigns by specific user IDs. For resellers, ensured that only campaigns created by their associated users are displayed. Additionally, added filters for user wallet details and recharge requests in the reseller module. Completed 04/11/2025 08:21 PM
RCS Panel Rashi Garg Today, I enhanced the theme and responsiveness across all three modules for a more cohesive user experience. I also made several key updates: added a feature to display pending requests in the notification section for resellers, restricted archived campaigns to show only those belonging to the respective user, and implemented toast notifications wherever necessary for better user feedback. Additionally, I thoroughly tested the updates to ensure seamless functionality.... Completed 04/11/2025 08:21 PM
Digital Marketing Panel Pawanpreet Kaur Today, I worked on the Content Calendar and Remarks modules. I added and updated some functionalities to improve the workflow. I also fixed and tested the content update API to ensure it works properly with the correct data Done 04/11/2025 08:17 PM
LMS Internal Panel Ayush Fixed bugs and tested the testing, routing, and RN-upload sections in the panel. Also added a detail modal in the ticket panel for viewing ticket details. Working on it 04/11/2025 08:16 PM
Digital marketing panel Anshu Chauhan Today I worked on calender module of the user and manager. I have added remarks, view and edit functionality and integrated all the related api's. done 04/11/2025 06:56 PM
Gate Pass Management Yash Veer Jain complete the required changes which is mentioned in the mail by the hr team complete the required changes with adding new functionalities like exporting employees data ,make two tabs for active employees and past employees, give options to activate and deactivate the employees 04/11/2025 06:55 PM
GatePass (App) Shashank Vyas Today i read more documentation of SQLite implement it on the gatepass app to store local data for visitors and employee attendance. I configured database tables, integrated syncing logic, resolved type and network issues. faced some error in implementing SQLite in the app. done 04/11/2025 06:52 PM
RCS Panel Rahul Yadav Worked on billing controller and modified it's models Done 04/11/2025 06:38 PM
Digital marketing panel Shivam Kumar Added notification Service and Email service in Remarks Completed 03/11/2025 11:42 PM
RCS Panel Kashish varshney I made changes in Campaign APis and Transaction Apis Done 03/11/2025 09:45 PM
RCS Panel Rashi Garg Today, I implemented a notification functionality to keep users informed about remarks and recharge requests. I also worked on enhancing the responsiveness. Completed 03/11/2025 08:55 PM
RCS Panel Priyanshi Jain Today, I completed the billing section and made UI enhancements to improve the overall user experience. Also resolved an issue in the campaign section for the admin module. Done 03/11/2025 08:54 PM
Digital marketing panel Aditya Today I worked on completing the Apis of post approval to fetch based on userid along with fetch variation ,remarak,media Done 03/11/2025 08:24 PM
DWR Aniket Today I worked on Service of DWR project in which I changed that on first and third Saturday no report will be sent and made a template's for different departments daily wise report email Done 03/11/2025 07:54 PM
Onboarding Panel Mohit kaushal Today I worked on customer agreement module in which I added new field and updated the controller and the database Done 03/11/2025 07:53 PM
LMS Internal Panel Shreya Today I worked on Routing module in which I added image while multiple routing and attachment is being sent in Email In progress 03/11/2025 07:46 PM
Gate Pass Management Yash Veer Jain Start Working on required changes in the hr dashboard Complete the department part page changes and also make api's for that 03/11/2025 07:45 PM
LMS Website Yash Veer Jain Review the job Posting part and give demo to the hr Done 03/11/2025 07:38 PM
Digital Marketing Panel Pawanpreet Kaur Today, I worked on the remarks workflow where I implemented bulk remark add and bulk resolve functionality. I also updated the date-based filtering API to fetch content using year, month, and day parameters, and optimized the query to ensure accurate record results. Done 03/11/2025 06:50 PM
GatePass (App) Shashank Vyas Today, I work on improving the UI consistency and dark mode integration in the gatepass app . I updated the ThemeContext for dynamic dark/light mode switching, worked on applying the theme to multiple screens . then i setup the sqlite and read the documentation to understand how to use sqlite in the app. done 03/11/2025 06:46 PM
RCS Panel Rahul Yadav Today I worked on billing controller where i added update details and added new fields in model Done 03/11/2025 06:41 PM
RCS Panel Kashish varshney Fix APis for Archive Campaign and Get Remark and add a Billing System Done 01/11/2025 09:27 AM
LMS Website Admin Panel Saloni Jain Today i worked email signature template Done 31/10/2025 10:24 PM
Digital Marketing Panel Yash Veer Jain Work on the accounts section dashboard of a user Done 31/10/2025 09:52 PM
RCS Panel Rahul Yadav Billing controller Today I worked on billing controller and added necessary Api for user details with Authorization 31/10/2025 09:32 PM
Digital marketing panel Shivam Kumar Implement PostApprovalMedia Model, Service, and Controller. Configure email notification functionality for Admin — to send mail when a new user is created. Both tasks completed successfully and tested. 31/10/2025 08:37 PM
RCS Panel Priyanshi Jain Today, I completed the "Add Remarks" and "View Remarks" sections for both the admin and user modules. Also,successfully integrated the billing section across the reseller, admin, and user modules. Completed 31/10/2025 08:36 PM
RCS Panel Rashi Garg Today, I updated the status in archived campaigns and worked on enhancing responsiveness in the admin panel. Also,implemented authorization for the integrated APIs to ensure secure access. Completed 31/10/2025 08:36 PM
Digital marketing panel Anshu Chauhan Enhance the ui of calender and integrated api to fetch the event so that user can view particular event, edit and delete them. And fix the bugs in the event module. Done 31/10/2025 08:25 PM
Digital marketing panel Aditya Today I worked on post approval module where I add functionality to upload image and video format and also create get Apis. Done 31/10/2025 08:05 PM
Digital Marketing Panel Pawanpreet Kaur Today, I worked on the Content Calendar and Remarks modules. I added stage-based logic for Manager and Admin, handled status updates, and updated the approval workflow. In the Content Calendar module, I updated existing APIs and created some new ones to enhance functionality. Done 31/10/2025 07:56 PM
Campaign Mohit kaushal Today I worked on campaign info module in which I added startDate of campaign and end date of campaign Done 31/10/2025 07:49 PM
LMS Internal Panel Shreya Today, I worked on the routing module and implemented a new functionality related to image upload in the “Create Routing” section. Now, when a mail is sent, the image will also be sent along with it. This functionality has been completed successfully. The same functionality now needs to be implemented in the AmSuggested Routing section. Done 31/10/2025 07:48 PM
GatePass (App) Shashank Vyas Today, I worked on fixing the DateTimePicker issue in the Add Visitor form and tested the overall form functionality. I’m very close to completing the Guard Panel. I also created the Pending Checkout page, integrated its API, added employee attendance APIs to the Attendance page, and built the Profile page layout. done 31/10/2025 06:58 PM
Digital marketing panel Abhimanyu singh update the component for upload creative to show uploaded content done 30/10/2025 11:17 PM
LMS Internal Panel Ayush Added cancel button for cancelling the routing and testing requests, also added image section in custom and am suggested routing section Done 30/10/2025 11:15 PM
Digital marketing panel Shivam Kumar Add PostApprovalVariation Model, Service, and Controller Completed and Tested 30/10/2025 10:19 PM
RCS Panel Rahul Yadav Remarks in Wallet controller Today I worked on wallet controller where i modified the wallet controller and resolved the bugs 30/10/2025 09:47 PM
LMS Website Admin Panel Saloni Jain Today i worked on the email Signature template nd create 2 templates nd In progress 30/10/2025 09:29 PM
Digital marketing panel Aditya Today I worked on Handel the the approval functionality where post is gone through three steps like user to manager to admin and also down with three steps when remarks added by admin and also handel remarks Done 30/10/2025 08:47 PM
GatePass (App) Shashank Vyas Today I work on add visitor form fixed some error occurred while fetching APIs and then i made some changes in the todays visitor table and integrate api to check out the visitor and edit or see details of the visitor and then i made employees attendance page layout. Done 30/10/2025 07:55 PM
Campaign Mohit kaushal Today I worked on add campaign and campaign info module In progress 30/10/2025 07:39 PM
LMS Internal Panel Shreya Today I worked on Routing and testing module in which I added new funcnality and updated the code Routing module testing done and Testing module is in progress 30/10/2025 07:35 PM
Digital Marketing Panel Pawanpreet Kaur Today, I worked on the Remarks module, made changes in its APIs, and tested the Approval API. I also worked on the Month Content Approval, updating its API with the latest logic and improvements. Done 30/10/2025 07:30 PM
HRMS Documentation Work Kashish varshney I made architecture of exit module in HRMS Done 30/10/2025 07:12 PM
Digital Marketing Panel Yash Veer Jain Starting working on account section of user Start 30/10/2025 07:12 PM
RCS Panel Priyanshi Jain Today, I implemented some changes in the UI of reseller module. Also,integrated APIs for adding remarks and replies, enabling communication within the module. Alongside the integration, fix the UI for these features to enhance the functionality. Completed 30/10/2025 07:10 PM
RCS Panel Kashish varshney I made changes in Create Remark and Reply-Remark and check download folder Done 30/10/2025 07:09 PM
RCS Panel Rashi Garg Today, I enhanced the admin panel by updating the search bar across all modules to enable searching by ID. I also updated the UI for completed status in campaigns and adjusted the table alignment for all modules. Additionally, I added a toggle switch for status in the "Add New User" section and implemented card routing on the dashboard.... Completed 30/10/2025 07:09 PM
Digital marketing panel Anshu Chauhan Worked on the calender module of the user. Integrated api to add event on the calender and fix the bugs Done 30/10/2025 06:59 PM
Gate Pass Management Yash Veer Jain worked with aman sir to make the backend live and verified the deployment successfully Done 30/10/2025 06:58 PM
Gate Pass Management Yash Veer Jain worked with aman sir to make the backend live and verified the deployment successfully Done 30/10/2025 06:58 PM
Gate Pass Management Yash Veer Jain Find the issue why employee list is showing different Done and also resolve the issue but live remaining 29/10/2025 09:31 PM
Onboarding Panel Yash Veer Jain Show the project to the management and attend the meeting Done 29/10/2025 09:31 PM
RCS Panel Priyanshi Jain Today I tested the recharge section of the admin module, ensuring all functionalities work as expected. I added a transaction table which shows transaction records, and updated the wallet UI for both reseller and user modules. Furthermore, I added a request table in the reseller module to display requests made by the reseller to the admin. Completed 29/10/2025 08:49 PM
Digital Marketing Panel Pawanpreet Kaur Completed the Remarks & Notification module — implemented backend logic to generate notifications whenever a remark is added, ensuring that only the logged-in user receives their unread notifications. Enhanced the notification model with IsRead, ReadAt, and SentAt fields for better tracking and real-time remark updates. Next Step: Implement the Whole Month Approval Calendar module. Done 29/10/2025 08:35 PM
RCS Panel Rashi Garg Today, I implemented the API for archived campaigns in the reseller module. I correctly integrate the API for archived campaigns in the dashboard with UI changes in the admin, reseller, and user modules, and also made some minor UI changes in the campaign section.... Done 29/10/2025 08:35 PM
Digital marketing panel Aditya Today I worked on the Post approval Remarks module in this i handel all the remarks and mange it like chat type this section is completed Done 29/10/2025 08:26 PM
Digital marketing panel Shivam Kumar Update User Controller, test role-based Admin and Create User functionalities, and verify Get User API. Task completed successfully and tested without major issues. 29/10/2025 08:25 PM
LMS Internal Panel Ayush Modify the routing and testing features as suggested and also tested it. Completed 29/10/2025 08:21 PM
GatePass (App) Shashank Vyas Today I worked on gate pass app dashboard pannel made add visitor form with form validation integrate add visitor API then I made today's visitor page which shows the visitors data through a table. Done 29/10/2025 08:04 PM
LMS Website Admin Panel Saloni Jain Fix the issue on event section of admin panel nd add the feature of multiple images Done 29/10/2025 07:56 PM
Digital marketing panel Anshu Chauhan Today I worked on calendar module of the user dashboard.integrated api for adding event. Done 29/10/2025 07:55 PM
HRMS Documentation Work Kashish varshney I completed a module of Payroll System in HRMS Done 29/10/2025 07:17 PM
RCS Panel Kashish varshney I made changes Archive Campaigns and Hold balance APis Done 29/10/2025 07:15 PM
RCS Panel Rahul Yadav Reseller wallet I made reseller wallet where reseller can request for recharge to admin for his wallet 29/10/2025 06:41 PM
Campaign Mohit kaushal Today I worked on UI of user module and campaign info In progress 29/10/2025 06:15 PM
LMS Internal Panel Shreya Today I worked on Routing module in which I made modification and updated the code and tested it Done 29/10/2025 06:15 PM
Campaign Aniket Today I worked add campaign and campaign info module In progress 29/10/2025 06:11 PM
RCS Panel Rahul Yadav Billing controller Worked on wallet controller and campaign controller 29/10/2025 01:32 AM
Digital marketing panel Anshu Chauhan Integrated login api and stored data in the redux store. Added role based navigation and worked on the upload creative section of the User. Completed. 28/10/2025 11:39 PM
Portfolio website Yash Veer Jain Complete the changes Done and live the project 28/10/2025 10:33 PM
Digital marketing panel Yash Veer Jain Work on the calender component ui Done 28/10/2025 10:33 PM
Digital marketing panel Shivam Kumar Added Forgot password, OTP Generation, email service, and many more updates in user controller . Completed and Pushed 28/10/2025 10:21 PM
RCS Panel Priyanshi Jain Today, I updated the website routing by linking the Case Study page to the Details page, and implemented lazy loading with placeholders on all images of the website. Completed 28/10/2025 09:41 PM
RCS Panel Rashi Garg Today, I updated the UI of the dashboard for User, Admin, and Reseller panels to improve overall design consistency. I also integrated APIs for the Archived Campaigns section in both the Admin and User dashboards. Additionally, I added preview and download options in the file path, enhancing accessibility and functionality. Done 28/10/2025 09:38 PM
Digital marketing panel Abhimanyu singh create component for content upload done. 28/10/2025 09:35 PM
RCS Panel Kashish varshney I made some changes in Remarks APi and wallets and campaign controller Done 28/10/2025 09:32 PM
Digital marketing panel Aditya Today I worked on posted remarks api i created full crud and handel it and test all this Apis, Done 28/10/2025 09:30 PM
Digital Marketing Panel Pawanpreet Kaur The Remarks Module is almost complete — all core APIs including Add, Resolve, and Approve have been developed successfully. The only pending tasks are adding role-based validation and implementing the notification logic. These remaining updates are expected to be completed within a day, by tomorrow. Done 28/10/2025 08:35 PM
LMS Internal Panel Shreya Today I worked on testing of Internal panel on Routing Module Done 28/10/2025 07:59 PM
Campaign Mohit kaushal Today I worked on the UI of campaign project in which designed login,register and add campaign Done 28/10/2025 07:45 PM
Campaign Aniket Today I worked on DWR project and campaign project in DWR I updated report date to read only and in campaign I started the project in mvc and made login register and add campaign and display of all campaigne and added button to start the campaigne Done 28/10/2025 07:40 PM
Digital marketing panel Shivam Kumar Added User model, controller And JWT Authentication service Completed process till Registration and Login Users. 27/10/2025 10:45 PM
Digital marketing panel Aditya Today, I worked on creating the db schema and project structure and also work on Apis of Approve content Done 27/10/2025 09:29 PM
RCS Panel Priyanshi Jain Today, I add pagination in the tables, fixed a navigation issue, and resolved the problem where details were not displaying properly. Completed 27/10/2025 09:08 PM
Digital marketing panel Abhimanyu singh begin work on digital marketing panel done 27/10/2025 09:03 PM
RCS Panel Rashi Garg In rcs panel , Today I integrate the transaction api in admin and change the ui and also made changes in the status section in campaign api to show the current status Completed 27/10/2025 08:57 PM
Digital marketing panel Anshu Chauhan Change the layout structure and worked on the upload creative section. Done 27/10/2025 08:09 PM
Digital marketing panel Yash Veer Jain setup the project and complete the requirement document setup the template of the project and complete the document 27/10/2025 08:06 PM
Portfolio website Yash Veer Jain Change the required changes mentioned by the digital marketing team complete all the required changes. Photo change is remaining. 27/10/2025 08:03 PM
Onboarding Panel Mohit kaushal Today I worked on testing of panel Done 27/10/2025 07:47 PM
RCS Panel Kashish varshney I work on the RCS panel and create some APi for wallet and campaign Done 27/10/2025 07:14 PM
Digital Marketing Panel Pawanpreet Kaur Today, I worked on the ContentCalender module in the Digital Marketing Panel project. I created the model, DTO, and full CRUD APIs with JWT-based user tracking for the “CreatedBy” field. The API returns complete response data, and I tested all endpoints successfully in Postman. Done 27/10/2025 06:20 PM
DWR Aniket Today I changed project allotment module that user can allot himself a project and updated service of sending email daily of daily wise report Done 27/10/2025 06:15 PM
LMS Internal Panel Shreya Today I worked on Amsuggest Routing module in which I did modification in create and update Api's Done 27/10/2025 06:12 PM
RCS Panel Rahul Yadav working on billing model completed wallet controller where i added request for recharge and approve by admin /reseller 27/10/2025 11:26 AM
HRMS Documentation Work Kashish varshney I extend an architecture of Exit Module in HRMS Done 27/10/2025 09:52 AM
LMS Internal Panel Ayush Tested and integated clone functionality in routing Added edit and clone functionality in custom routing and also tested the routing functionality 25/10/2025 11:39 PM
RCS Panel Rashi Garg First, I understood the RCS panel, then I integrated the API for all recharge requests, and added a recharge wallet action for admins. I also updated the available balance on the dashboard for users.... Completed 25/10/2025 10:56 PM
RCS Panel Priyanshi Jain Today,I worked on understanding the RCS panel, then I updated the campaign page to include a status update feature, and also added a wallet history section for users to view their transaction history. Done 25/10/2025 09:54 PM
LMS Website Admin Panel Anshu Chauhan Have to fix the bug of upload event and edit event page. And have to add delete functionality in blog, case study and event page Completed all the task of today. 25/10/2025 09:32 PM
Gate Pass Management Abhimanyu singh work on the ui of gatepass completed 25/10/2025 09:27 PM
RN_Mail_Reader Aditya Today I worked on created the Apis of track analyst of RN upload also track archive table Done 25/10/2025 08:25 PM
Digital Marketing Panel Mohit kaushal Worked on documentation of Marketing panel In progress 25/10/2025 07:22 PM
LMS Internal Panel Shreya Today I worked on Lms Internal panel and testing of it Done 25/10/2025 07:12 PM
DWR Aniket Today I worked on testing of DWR service Done 25/10/2025 07:12 PM
LMS Internal Panel Pawanpreet Kaur Worked on the Testing Controller to retrieve images from the TestingImage table and map them to their corresponding TestingId from the Testing table Completed 25/10/2025 06:38 PM
Digital Marketing Panel Yash Veer Jain meeting for the srs with marketing team Meeting done and also prepare the flowchart of the project 25/10/2025 05:24 PM
DWR Pawanpreet Kaur Tested the Email Service For Sending Daily Dwr reports on a fixed time and hosted it on the live server Completed 24/10/2025 08:33 PM
DWR Shreya Today I tested internal panel and hosted dwr service on IIS Done 24/10/2025 08:31 PM
RN_Mail_Reader Aditya Today I worked on add checks and validation where I check is if email is already read or recieved time and attachments name then i skip this file it is working fine Done 24/10/2025 08:29 PM
Onboarding Panel Yash Veer Jain Adding new fields in customer agreement test the project again Done 24/10/2025 07:00 PM
DWR Aniket Today I worked on service of DWR project in which email will be send of all the daily wise report at 9:30 Completed 24/10/2025 06:16 PM
Onboarding Panel Yash Veer Jain Add Two fields paymentterm and linkedin Url Done and also did testing for the shree vendor application 23/10/2025 11:00 PM
RN_Mail_Reader Aditya Today I Worked on testing 10 files in the que and it process one by one smoothely Done 23/10/2025 09:34 PM
RN_Mail_Reader Aditya Today , I completed the testing of service with all the file types and it is working smoothly and i test estimate 10 files Done 22/10/2025 09:34 PM
LMS Internal Panel Clinton Laishram Adding clone and edit functionality to routing module Successfully added the clone functionality to the add routing, add custom routing and already added routing. Give the functionality to the am user to edit their routing data until any action is taken by noc member of that particular routing data. Once noc member takes action on that routing then am user can't change anything. 22/10/2025 09:03 PM
RN_Mail_Reader Aditya Today I Tested the service carefully and check the headers it is mostly completed Done 18/10/2025 10:12 PM
RN_Mail_Reader Aditya Create a Service of Email Reader for RN Today I worked on created service of email reader , and test excel files by uploading. 17/10/2025 08:20 PM
Onboarding Panel Yash Veer Jain Show the project to the management Attend meeting but discussion pending still 17/10/2025 12:08 AM
Cpaas Shreya Today I worked on internal panel on routing and testing module Done 16/10/2025 09:17 PM
Billing And Invoice(Backend) Aniket Today I added new module of versioninfo in billing and invoice project and added controller of it Done 16/10/2025 09:15 PM
LMS Internal Panel Pawanpreet Kaur Today, I created a background service that runs automatically every night at 12:00 AM to update company currency and AM email between the Billing and Internal Panel databases. Done 16/10/2025 08:06 PM
LMS Internal Panel Shreya Today I worked on internal panel on routing module Done 15/10/2025 10:01 PM
Billing And Invoice(Backend) Aniket Today I Worked on Company module in which I added entity field and added paymentDate in bill module and updated the controllers as according to model Completed 15/10/2025 09:32 PM
Billing And Invoice(Backend) Pawanpreet Kaur Implemented and tested Email API with multiple recipients, CC/BCC, HTML body, attachments, and validation. Completed 15/10/2025 09:09 PM
HRMS Documentation Work Pawanpreet Kaur Completed the documentation work for all HRMS modules, including table structures, relationships, and descriptions. Done 10/10/2025 09:03 PM
HRMS Documentation Work Pawanpreet Kaur Today I made Changes in the TA module as we discussed and updated the schema of the tables Done 09/10/2025 09:08 PM
HRMS Documentation Work Kashish varshney I made a Documentation of Hrms modules Done 08/10/2025 09:33 PM
HRMS Documentation Work Pawanpreet Kaur Today I worked on the HRMS in which i made changes in Attandance Module and Payroll Module Done 08/10/2025 09:05 PM
Onboarding Panel Mohit kaushal Today I worked on testing of onboarding panel Done 08/10/2025 08:48 PM
HRMS Documentation Work Shreya Today I worked on HRMS table schema Done 08/10/2025 08:31 PM
Cpaas Aniket Today I worked on appsecret of user module in which I put limitation on app secret can be regenerated 4 times in 1 min Done 08/10/2025 08:28 PM
HRMS Documentation Work Kashish varshney I made a Documentation of TA and Onboarding modules Done 08/10/2025 09:59 AM
HRMS Documentation Work Pawanpreet Kaur Worked on the Onboarding Module and prepared its table schema. Completed 07/10/2025 09:27 PM
Cpaas Aniket Today I worked jwt in which I stored all the detail of the user in the app secret Comleted 07/10/2025 08:57 PM
HRMS Documentation Work Shreya Today i worked on Attendance Module and made schema for it Done 07/10/2025 08:51 PM
Cpaas Aniket Today, I worked on enhancing the backend functionality related to AppSecret generation and validation. I successfully implemented the GenerateAppSecret API endpoint, which now automatically captures the client’s IP address without relying on forwarded headers. Along with this, I integrated a custom logging mechanism to record details such as the user, generated AppSecret, and IP address for better tracking and debugging Done 07/10/2025 08:41 PM
LMS Website Priyanshi Jain Today, I fixed some bugs in the LMS website. Done 06/10/2025 11:10 PM
LMS Website Rashi Garg Today i worked on resolving bugs and issues in LMS website Completed 06/10/2025 11:06 PM
Cpaas Aniket Today i worked on User module in which I made changes that Appsecret can be regenerated and old appsecret will be deleted and on the basis of this user can Get information about Itself done 06/10/2025 08:34 PM
HRMS Documentation Work Kashish varshney I made a Document of TA module and update some fields Done 06/10/2025 07:32 PM
Url Shortner (Backend) Pawanpreet Kaur Store only genuine human clicks in the database and exclude bot/crawler traffic using User-Agent and IP checks. Completed 03/10/2025 09:21 PM
Onboarding Panel Mohit kaushal Today I worked on techform in which I changed that multiple columns with name can be created and made a combined Get api of techform and products . Completed 03/10/2025 09:05 PM
SMTP Shreya Today I worked on testing of SMPP with multipart message Completed 03/10/2025 09:00 PM
Cpaas Aniket Today I worked on user module in which I took field of app secret on basis of userid an appsecret is released and on the basis of app secret all the details of user is being displayed Done 03/10/2025 08:59 PM
HRMS Documentation Work Kashish varshney Completed the Architecture of HRMS Modules done 03/10/2025 12:09 PM
SMTP Shreya Today I worked on testing of SMPP In progress 02/10/2025 08:49 PM
SMTP Shreya Today I worked on testing of SMPP In progress 01/10/2025 08:43 PM
SMTP Shreya Today I worked on testing of SMTP project In progress 30/09/2025 09:38 PM
Cpaas Aniket Today I researched on documentation of razor pay and updated survey module on cpass project Done 30/09/2025 09:35 PM
Gateway Application Pawanpreet Kaur Today I worked on refining the Gateway status summary query, handled missing column issues, and successfully tested the changes thoroughly on both local and live environments. Completed 30/09/2025 08:45 PM
Gateway Application Pawanpreet Kaur Fetch Gateway-wise message status counts dynamically from all MessageLog_SENT* tables for a specific Gateway. Purpose: To aggregate message log data across multiple tables, showing status-wise counts in a single consolidated view. Completed 29/09/2025 09:09 PM
Url Shortner (Backend) Pawanpreet Kaur Implemented X-Forwarded-For IP detection in the redirect API, enhanced ClickAnalytics logging, and worked on ngrok setup to expose Swagger externally. Redirect and tracking are working fine locally 29/09/2025 09:04 PM
HRMS Documentation Work Kashish varshney I made a architecture of Attendance module in Hrms Done 29/09/2025 12:40 PM
Gateway Application Pawanpreet Kaur Today, I took a complete backup of Telegram data by exporting and saving the chat history of more than 400 channels in JSON format. Completed 27/09/2025 09:31 PM
Cpaas Aniket Today I worked on survey module in which I made usecase field to store string .and worked on email sending while creating survey Done 27/09/2025 09:31 PM
Onboarding Panel Mohit kaushal Today I worked on customer agreement module in which I added fields and updated the controller and stored id in Db when agreement is passed Completed it 27/09/2025 09:27 PM
Onboarding Panel Yash Veer Jain testing and documentation Working on the documentation and user manual 27/09/2025 02:45 PM
Onboarding Panel Yash Veer Jain testing and documentation Working on the documentation and user manual 27/09/2025 02:45 PM
LMS Internal Panel Shreya Today i worker on routing module of Lms Internal Panel Completed 27/09/2025 12:00 AM
LMS Internal Panel Shreya Today I'm working on lms internal panel working on the routing module In progress 26/09/2025 10:11 PM
Cpaas Aniket Today I made changes in login as removed oauth google authentication and in survey made an api to register only company domain not all public domain and while sending survey added send email method to user Completed it 26/09/2025 10:06 PM
Onboarding Panel Mohit kaushal Today I made a change in all email as firstly it was sent to one user but now I changed to multiple users Completed it 26/09/2025 10:04 PM
Onboarding Panel Yash Veer Jain working on presales dashboard work on the Presales sidebar 26/09/2025 08:26 PM
HRMS Documentation Work Kashish varshney I made an architecture of Candidate Application form and update changes Done 26/09/2025 07:55 AM
Onboarding Panel Mohit kaushal Today I worked on the Onboarding project, where I made several important enhancements to improve functionality and data management. I added new fields related to the customer agreement, ensuring that agreement details can now be properly captured and stored within the system. In addition to this, I introduced support for handling multiple email addresses in the database, allowing better flexibility in storing and managing customer communication details. Completed it 25/09/2025 09:04 PM
Onboarding Panel Yash Veer Jain working on the form validation and for the upload file Complete the Form validation for upload file ,forn customer agreement is remaining awaiting for the api 25/09/2025 09:03 PM
Remote Daifaan Aditya CHECK Networks of Ports Today I worked on. Check network connectivity of the ports and also I push messages through smpp and check DLRs port statuss 25/09/2025 09:03 PM
Cpaas Shreya Today I worked on the cpass project where I added a campaign module along with an API to post campaign details. In this, a file containing numbers can be uploaded, and messages will be sent one by one with the provided message content. Additionally, all the numbers are stored in the database along with the URL of the uploaded file for reference. Done 25/09/2025 08:57 PM
Cpaas Aniket Today I worked on Campaign module in which I made get api to download the file while uploading campaign Completed it 25/09/2025 08:51 PM
Remote Daifaan Pawanpreet Kaur Validation & Testing Performed detailed testing on Diafaan UI to validate the fix and confirm stable performance. 25/09/2025 08:42 PM
Gateway Application Pawanpreet Kaur Data Issue Resolution Identified and fixed data-related issue in the application to ensure proper functionality. 25/09/2025 08:40 PM
LMS Website Shivam Kumar Added Survey API Added get, put, delete, post apis according to the requirements. 24/09/2025 11:25 PM
Onboarding Panel Yash Veer Jain Work on the theme and sidebar completed the theme setting 24/09/2025 10:00 PM
LMS Website Rashi Garg Today, I updated the Policies page and explored Redux, gaining an understanding of how it manages application state in React. In Progress 24/09/2025 09:31 PM
LMS Website Priyanshi Jain Today, I made some changes in the website and also learned the basics of Redux for state management. Done 24/09/2025 09:30 PM
Remote Daifaan Aditya Add functionality of Handel failed message Today I worked on Handel failed messages if messages countinuiosly failed then port is automatically paused. 24/09/2025 09:11 PM
Remote Daifaan Pawanpreet Kaur UI Status Handling & Gateway Pause/Resume Fi Handled status codes (102 → Queue, others → Pending) for clearer UI, and improved Gateway Pause/Resume for smoother control. 24/09/2025 08:40 PM
Onboarding Panel Mohit kaushal Added api of photo upload in remarks and made some changes according to api Done 24/09/2025 07:05 PM
HRMS Documentation Work Kashish varshney I made an architecture of TA module and update some fields Done 23/09/2025 10:25 PM
Cpaas Shreya working on configuring what'sapp api in what'sapp Templete of cpaas project completed 23/09/2025 10:04 PM
Cpaas Aniket Integrate whatsapp send message api Completed it 23/09/2025 10:01 PM
LMS Website Rashi Garg Today, I worked on resolving bugs and implemented changes in the navbar of the website. Completed 23/09/2025 09:40 PM
LMS Website Priyanshi Jain Today, I updated the website routing by linking the Case Study page to the Details page, and implemented lazy loading with placeholders on all images of the website. Completed 23/09/2025 09:37 PM
HRMS Documentation Work Yash Veer Jain Discuss the field for the Talent Acquistion Discuss the fields and also discuss with the vibhuti maam 23/09/2025 09:22 PM
Gate Pass Management Yash Veer Jain Integrate the required Api for the Hr dashboard & Also integrate the coupan feature Complete target 23/09/2025 09:20 PM
Remote Daifaan Aditya Build Connection and Push Messages Today, I work on push messages through smpp and check DLRs and in ui I create filter to search com based row. 23/09/2025 09:15 PM
Gateway Application Pawanpreet Kaur 200 Status Code Analysis Checked and displayed the count of status code 200 from all MessageLog tables (based on the current connection string and DBOUT list) in tabular form with Database Name, Table Name, and Count. 23/09/2025 08:43 PM
Onboarding Panel Yash Veer Jain Demonstrate the Project Test the project & Also demonstrate the project and note the inputs 23/09/2025 08:19 PM
Onboarding Panel Mohit kaushal Documentation of phase 1 of onboarding project Completed the documentation 23/09/2025 08:17 PM
SMTP Shreya working on the testing of smpp on server completed 22/09/2025 09:40 PM
LMS Website Admin Panel Anshu Chauhan Created upload event and edit event functionality on admin panel. Integrated api on both the pages. Done 22/09/2025 09:14 PM
Gate Pass Management Yash Veer Jain Complete HR Dashboard for the Gate Pass Management Make the three component in this HR Dashboard Where Hr Can view the details like daily attendance, and Employee-wise Attendance with Export to Excel Feature 22/09/2025 09:10 PM
Gateway Application Pawanpreet Kaur Today’s target is to use the current connection string to fetch the corresponding row from the Strings table, then take the DbOut field from that row to connect to the target database, read the MessageLog tables listed there, and calculate the total count of entries with StatusCode = 200, handling all errors and logging the process. The process works as intended: it uses the current connection string to find the DbOut database from the Strings table, connects to that database, reads the MessageLog tables, and counts all entries with StatusCode = 200. Logging and error handling are properly implemented. The only problem is the login failure to the target database, which must be resolved for the count to work correctly. 22/09/2025 09:01 PM
Onboarding Panel Yash Veer Jain Testing Of Full Project All tested. Also Resolve Minor UI Issue and also tell the backend minor issuue to the backend developer 22/09/2025 08:32 PM
Gate Pass Management Abhimanyu singh to add 3 tables in the hr dashboard done 22/09/2025 08:00 PM